My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - ZOA No. 20204-01 South Coast Technology Center
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024 Regular & Special HA
>
Item 28 - Public Hearing - ZOA No. 20204-01 South Coast Technology Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 9:17:46 AM
Creation date
8/6/2024 8:50:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
8/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZOA No. 2024-01 for South Coast Technology Center at 3100 West Lake Center Drive <br />July 8, 2024 <br />Page 3 <br />overall development will be developed as a "shell construction" or "base build," which <br />consists of only the building core and exterior elements (the shell). The interior build -out <br />work is anticipated to be completed by any future tenants, to carry out before occupancy <br />of the building. Shell construction is a very common building model/approach, especially <br />for industrial buildings, that creates a blank slate on which prospective tenants can create <br />a working space that is an exact fit for their own needs. <br />In keeping with the campus feel, the buildings and site improvements are of a cohesive <br />design with modern features and color scheme comprised of white, black, various shades <br />of grey and an accent color. The building materials consist of concrete tilt up walls with <br />groves and score lines for added texture, vertical and horizontal aluminum accents at the <br />entryway, adjacent to glass storefronts. The outdoor patios would feature metal panel <br />canopies with "groove picnic tables," "shear," and "Orion" benches, which are comprised <br />of concrete and clean lines, in keeping with the modern asthenic of the center. <br />Landscaping would also be planted in compatible, neutral above -ground planters, as well <br />as in planter beds throughout the site, featuring a variety of colorful flowering shrubs, soft <br />foliage, accent shrubs and evergreen shrubs. Additionally, various shade trees and <br />flowering accent trees would be planted at entryways, site perimeter, and the parking lot. <br />The entryway trees would be further accentuated with high quality and durable up -lighting. <br />Although the site is anticipated to be enclosed by eight -foot wrought iron fencing, a <br />minimum of ten feet of landscaping would be provided along the property frontages for <br />buffering and screening. <br />Access to Building 1 would be provided from Susan Street and Lake Center Dive, while <br />Building 2 and 3 would have two entries from Lake Center Drive and one entry from Susan <br />Street. The driveways would feature decorative paving to enhance the entryways and <br />gates that would remain open during business hours and locked after hours. The site plan <br />has been designed in a manner that would allow fire apparatus navigation through the <br />site, designed to meet all fire lane requirements, and to meet the minimum fire separation <br />requirements and setbacks. <br />Table 1: Project and Location Information <br />Item <br />Information <br />3100, 3110, 3120, 3130, and 3400 West Lake Center Drive <br />Project Address and Council Ward <br />West Lake Center Drive (APNs: 414-272-10, 414-272-09, <br />414-261-01) — Ward 1 <br />Nearest Intersection <br />Lake Center Drive and Susan Street <br />General Plan Designation <br />Industrial IND <br />Zoning Designation <br />Specific Development No. 58 (SD-58) <br />North <br />Calvary Chapel <br />East <br />Lake Center A Professional Office <br />Surrounding Land Uses <br />Park/parking structure <br />South <br />Santa Ana Processing and Distribution <br />Center <br />West <br />Lake Center Business Park <br />Property Size <br />15.94 acres (694,297 square feet) <br />
The URL can be used to link to this page
Your browser does not support the video tag.