My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Main Library Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/20/2024
>
Item 21 - Main Library Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 3:47:02 PM
Creation date
8/14/2024 10:22:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Library
Item #
21
Date
8/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 June 2024 � 4 AVA [« 41N 4M 1 i <br />G R O U P 4 <br />Jason Gabriel CLIENT CONTR #: A-2022-060 <br />ARCH ITECTU RE <br />City of Santa Ana <br />R E S E A R C H + <br />PLANNING, INC <br />Public Works Agency ADD SERVICE #: 07 Supplemental CA <br />20 Civic Center Plaza PO Box 1988 <br />Santa Ana, CA 92702 BILLING TYPE: Lump Sum <br />211 LINDEN AVENUE <br />SO. SAN FRANCISCO <br />PROJECT NAME: G4 PROJECT #: GROUP 4 PHASE #: <br />Santa Ana Library Renovation 22575-01 I07 <br />CA 9 4 0 a 0 USA <br />T: 6 5 0• 8 7 1• 0 7 0 9 <br />SCOPE SUMMARY: <br />Extension of CA services for another 6 months beyond original 12 month duration outlined in <br />F:650.871.7911 <br />Prime Agreement to a new total of 18 months. Excludes Page & Turnbull included in ASR 05. <br />w w w g 4 a r c h . c o m <br />Excludes basic shop drawing review included in ASR 04 Reinstated Task 5. Includes virtual <br />attendence in weekly OAC meetings and monthly in -person attendence and field walk for full 18 <br />months. Further extension of CA duration or supplemental travels will be Additional Services. <br />LUMP SUM <br />ADD SERVICE FEE MARKUP EXTENSION <br />6 months Additional CA, see <br />attached breakdown $122,861 incl $122,860.86 <br />6/27/2024 <br />David Schnee Date <br />Principal in Charge <br />Jason Gabriel <br />Acting City Engineer <br />Date <br />DESIGN FEE SUB -TOTAL: $122,860.86 <br />G:\22575-01 Santa Ana Library\Y-Contract\CLIENT\Amendment\Amendment 1 2024-XX-XX\Santa Ana Fee -hours 2024-06-27 Amendment 01 <br />ASR 07 Supp CA 2024-06-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.