My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Constuction Contract for Grand Avenue Rehabilitation from McFadden Avenue to First Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/20/2024
>
Item 25 - Constuction Contract for Grand Avenue Rehabilitation from McFadden Avenue to First Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 3:48:23 PM
Creation date
8/14/2024 10:22:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25
Date
8/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 6 <br />PROJECT TITLE: <br />Grand Ave Roadway Rehab: <br />McFadden Ave to 1st St <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP A <br />N <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has been <br />developed to prioritize and recommend the most cost-effective roadway <br />Irepairs, and maximize the return from available funding for street <br />pavement. This segment of Grand Avenue pavement rehabilitation is <br />identified as a high priority in the PMP. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction 1,724,379 - - - - - - <br />Engineering 518,120 <br />TOTAL 2,242,499 - - - - - - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />CMAQ 972,882 - - - - - - <br />GAS TAX 1,269,617 <br />TOTAL 2,242,499 - - - - - - <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works C/P Engineering Jason Gabriel, Principal Civil Engineer 06-Aug-2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.