My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Constuction Contract for Grand Avenue Rehabilitation from McFadden Avenue to First Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/20/2024
>
Item 25 - Constuction Contract for Grand Avenue Rehabilitation from McFadden Avenue to First Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 3:48:23 PM
Creation date
8/14/2024 10:22:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25
Date
8/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6702 <br />GRAND AVENUE ROADWAY REHABILITATION FROM MCFADDEN AVENUE TO <br />FIRST STREET <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: All American Asphalt <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />1,060 <br />CY <br />$ <br />$ <br />215.00 <br />227,900.00 <br />2 <br />AC Pavement* <br />1,990 <br />TN <br />$ <br />$ <br />150.00 <br />298,500.00 <br />3 <br />Cold Mill (2-3/8") Expect Pavement <br />305,000 <br />SF <br />$ <br />$ <br />Fabric 2" Below Existing Surface <br />0.54 <br />164,700.00 <br />4 <br />Asphalt Rubber and Aggregate Membrane <br />33,990 <br />SY <br />$ <br />$ <br />(ARAM) <br />7.00 <br />237,930.00 <br />5 <br />Asphalt Rubber Hot Mix (ARHM) <br />3,900 <br />TN <br />$ <br />$ <br />147.18 <br />574,002.00 <br />6 <br />PCC Sidewalk (T=4") <br />100 <br />SF <br />$ <br />$ <br />31.88 <br />3,188.00 <br />7 <br />PCC Driveway Approach (T = 8") <br />600 <br />SF <br />$ <br />$ <br />22.00 <br />13,200.00 <br />8 <br />PCC Curb and Gutter (Type A-2-8) <br />500 <br />LF <br />$ <br />$ <br />97.00 <br />48,500.00 <br />9 <br />Cross -Gutter (Local Street) <br />1,400 <br />SF <br />$ <br />$ <br />31.00 <br />43,400.00 <br />10 <br />Furnish and Install Detectable Warning <br />1 <br />EA <br />$ <br />$ <br />Surface (Caltrans STD. A88A) <br />3,400.00 <br />3,400.00 <br />11 <br />Adjust Sewer and Drainage Manhole to <br />15 <br />EA <br />$ <br />$ <br />Finished Grade <br />1,550.00 <br />23,250.00 <br />12 <br />Furnish and Install New Water Valve <br />25 <br />EA <br />$ <br />$ <br />Frame and Cover to Finished Grade <br />1,250.00 <br />31,250.00 <br />13 <br />Furnish and Install Traffic Loops Type F <br />9 <br />EA <br />$ <br />$ <br />471.00 <br />4,239.00 <br />P-1 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.