Laserfiche WebLink
Demolition: <br />1. Remove and save for City, (3) existing concrete 30' poles, protect (5) existing area lights to be re -mounted on new <br />30' poles. <br />2. Demo/dispose of (3) light pole foundation to 12" below grade, demolished light pole bases to be covered with <br />native soils from site. <br />3. Leave existing power feed in place to re -feed area lights being relocated to new poles. <br />Foundations, Poles, and Luminaires: <br />1. Mark and confirm pole locations per the aiming diagram provided. If there are any issues, immediately notify your <br />Musco Project Manager. <br />2. Provide labor, materials, and equipment to install (3) LSS foundations as specified on Layout and per the stamped <br />foundation drawings, if applicable. <br />3. Remove spoils and dispose of off site. <br />4. Provide labor, materials, and equipment to assemble Musco TLC -LED luminaires, electrical component enclosures, <br />poles, and pole harnesses. <br />5. Re -mount (5) existing area lights from removed pole to new poles. <br />6. Provide labor, equipment, and materials to erect (3) 30' dressed LSS Poles and aim utilizing the pole alignment <br />beam. <br />Electrical: <br />1. Provide labor, materials, and equipment to install new breakers as needed to the existing panel. Existing main <br />service, and panel to be utilized. <br />2. Provide labor, materials, and equipment to install all underground wiring, existing conduit and pull boxes etc. to be <br />utilized; terminate wiring as required. <br />3. Extend existing circuits from existing pole boxes into new poles to re -feed (5) relocated area lights. <br />3. Provide as -built drawings on completion of installation. <br />Control System: <br />1. Provide labor, equipment, and materials to install Musco Control -Link cabinet and terminate all necessary wiring. <br />2. Provide a dedicated 120 V 20 A controls circuit or a step-down transformer for 120 V control circuit if not available. <br />3. Check all zones to make sure they work in both auto and manual mode. <br />4. Commission Control -Link® by contacting Control -Link CentralT" at 877-347-3319. <br />CV V V 2016, 2023 Musco SpoOs Ughtin9, LLC • M-2166-enU5-14 <br />musco- <br />4of6 <br />