Laserfiche WebLink
• General -use facility expenditures, to include, but not limited to ordinary facility maintenance, <br />contracts for maintenance, and specifically backup or emergency generators; <br />• General vehicle maintenance, service contracts, or warranties. This is different from maintenance <br />and sustainment costs that are allowable, but only for projects funded under a grant award. For <br />projects or equipment not funded by the grant award, general maintenance, service contracts, and <br />warranties are not allowable; <br />• Expenditures for items such as general -use software (word processing, spreadsheet, graphics, <br />etc.), general -use computers and related equipment (other than for allowable M&A activities, or <br />otherwise associated preparedness or response functions), general -use vehicles, licensing fees, <br />recurring operating costs (e.g., cell phone services, maintenance contracts); <br />• Organizational operating expenses; <br />• Personnel costs, to include, but not limited to, overtime and backfill (except as detailed above); <br />• Activities unrelated to the completion and implementation of the IBSGP; <br />• Other indirect costs (meaning property purchase, depreciation, or amortization expenses); <br />• Initiatives in which federal agencies are the beneficiary or that enhance federal property; <br />• Initiatives which study technology development; <br />• Proof -of -concept initiatives; <br />• Initiatives that duplicate capabilities being provided by the Federal Government; <br />• Other items not in accordance with the AEL, in accordance with FEMA Policy 207-22-0002, <br />Prohibited or Controlled Equipment Under FEMA Awards, or not previously listed as allowable <br />costs; and <br />• Pre -award costs are not allowable and will not be approved, with the exception of costs resulting <br />from pre -award grant writing services provided by an independent contractor that shall not <br />exceed $1,500, a s d e t 4iwla a d U im satdRrithe IBSf3B NOFO. <br />Other Allowable Costs <br />Maintenance and Sustainment Costs <br />The use of FEMA preparedness grant funds for maintenance contracts, warranties, repair or replacement <br />costs, upgrades, and user fees are allowable under all active and future grant awards, unless otherwise <br />noted. Preparedness grant funds may be used to purchase maintenance contracts or agreements, warranty <br />coverage, licenses, and user fees. These contracts may exceed the period of performance if they are <br />purchased incidental to the original purchase of the system or equipment as long as the original purchase <br />of the system or equipment is consistent with that which is typically provided for, or available through, <br />these types of agreements, warranties, or contracts. When purchasing a stand-alone warranty or extending <br />an existing maintenance contract on an already -owned piece of equipment system, coverage purchased <br />may not exceed the period of performance of the award used to purchase the maintenance agreement or <br />warranty. As with warranties and maintenance agreements, this extends to licenses and user fees as well. <br />Grant funds are intended to support the National Preparedness Goal (the Goal) and fund projects that <br />build and sustain the core capabilities necessary to prevent, protect against, mitigate the effects of, <br />respond to, and recover from those threats that pose the greatest risk to the security of the Nation. In order <br />to provide recipients the ability to meet this objective, the policy set forth in IB 379: Guidance to State <br />Administrative Agencies to Expedite the Expenditure of Certain DHS/FEMA Grant Funding allows for <br />the expansion of eligible maintenance and sustainment costs which must be in (1) direct support of <br />existing capabilities; (2) must be an otherwise allowable expenditure under the applicable grant program, <br />and (3) be tied to one of the core capabilities in the five mission areas outlined in the Goal. Additionally, <br />eligible costs may also be in support of equipment, training, and critical resources that have previously <br />been purchased with either federal grant or any other source of funding other than FEMA preparedness <br />grant program dollars. <br />���Nos��. e <br />��� <br />FEMA IBSGP Appendix 12023 Page E-8 <br />