My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 36 - Resolution, Agreement, and Appropriation Adjustment Accepting the FY 2023 Emergency Management Performance Grant
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/20/2024
>
Item 36 - Resolution, Agreement, and Appropriation Adjustment Accepting the FY 2023 Emergency Management Performance Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:49:20 AM
Creation date
8/21/2024 12:19:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
36
Date
8/20/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o For construction under an award, submit: SF-424D, Standard Assurances <br />(Construction), submitted via the forms generated by ND Grants, in addition to or <br />instead of SF-424B <br />SF-LLL, Disclosure of Lobbying Activities, submitted via the forms generated by ND Grants; <br />and <br />Indirect Cost Agreement or Proposal, submitted as an attachment in ND Grants if the budget <br />includes indirect costs and the applicant is required to have an indirect cost rate agreement or <br />proposal. If the applicant does not have or is not required to have an indirect cost rate agreement <br />or proposal, p l e a s e s e e t h e " F u n d i n g R e s t r i c t i o n s a n i <br />program NOFO and the section below on indirect costs for further information regarding <br />allowability of indirect costs and whether alternatives to an indirect cost rate agreement or <br />proposal might be available or contact the relevant Preparedness Officer or Program Manager for <br />further instructions. <br />Generally, applicants need to submit either the non -construction forms (i.e., SF-424A and SF-424B) or <br />construction forms (i.e., SF-424C and SF-4241)), meaning that applicants that only have construction <br />work and do not have any non -construction work need only submit the construction forms (i.e., SF-424C <br />and SF-4241)) and not the non -construction forms (i.e., SF-424A and SF-424B), and vice versa. However, <br />applicants who have both construction and non -construction work under these programs need to submit <br />both the construction and non -construction forms. <br />Intergovernmental Review <br />An intergovernmental review may be required. Applicants must contact their state' s S i n g l e P o i n t <br />Contact to comply with the state' s p r o c e s s u n d e r. E x e c u t i v e Or d e r 1 2 <br />See Executive Orders I National Archives and Intergovernmental Review (SPOC Liso (whitehouse. Roy). <br />Funding Restrictions and Allowable Costs <br />All costs charged to awards covered by this Manual must comply with the Uniform Administrative <br />Requirements, Cost Principles, and Audit Requirements at 2 C.F.R. Part 200, unless otherwise indicated <br />in this Manual, the applicable program NOFO, or the terms and conditions of the award. This includes, <br />among other requirements, that costs must be incurred, and products and services must be delivered, <br />within the period of performance of the award. See 2 C.F.R. § 200.403(h) (referring to budget periods, <br />which for FEMA preparedness grant awards is the same as the period of performance). <br />In general, the Cost Principles establish standards for the allowability of costs, provide detailed guidance <br />on the cost accounting treatment of costs as direct or administrative costs, and set forth allowability <br />principles for selected items of cost. More specifically, except as otherwise stated in the applicable <br />program appendix to this Manual, the program NOFO, or the terms and condition of an award, costs <br />charged to awards covered by this Manual must be consistent with the Cost Principles for Federal Awards <br />located at 2 C.F.R. Part 200, Subpart E. In order to be allowable, all costs charged to a FEMA award or <br />applied to the cost share must be reasonable in nature and amount and allocable to the particular FEMA <br />award. <br />Additionally, all costs charged to award s mu s t c o m p l y w i t h t h e g r a n t p r o <br />policies, NOFOs, and requirements in this Manual and the applicable NOFO, as well as with the terms <br />and conditions of the award. If FEMA staff identify costs that are inconsistent with any of these <br />requirements, these costs may be disallowed, and FEMA may recover funds as appropriate, consistent <br />with applicable laws, regulations, and policies. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.