My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CABIFORNIA INC. (SARTC FOUNTAIN REPLACEMENT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
CABIFORNIA INC. (SARTC FOUNTAIN REPLACEMENT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 3:21:55 PM
Creation date
8/21/2024 3:44:00 PM
Metadata
Fields
Template:
Contracts
Company Name
CABIFORNIA INC.
Contract #
P 24-6058
Agency
Public Works
Council Approval Date
8/6/2024
Insurance Exp Date
7/30/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 24-6058 <br /> SARTC FOUNTAIN REPLACEMENT <br /> BID PROPOSAL <br /> TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br /> FROM: (,p Incb;lord;a <br /> REQUIREMENT: <br /> The undersigned bidder declares ghat they have carefully examined the location of the proposed <br /> work, that they have examined the Contract Documents in its entirety and hereby proposes to <br /> furnish all material and do all the work required to complete the said work in accordance with <br /> said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br /> following schedule: <br /> Item Description Qty Unit Unit Price Amount <br /> ---^ I Mobilization I LS S 30000 <br /> 2 Demolition l LS S g QQoQ <br /> 3 Concrete work l LS S 3'$000 <br /> 4 Metal stud framing,& I LS S a.2000 <br /> miscellaneous framing, <br /> 5 New gyp hoard,patching,new I LS S $ <br /> painting and caulking 0OQ <br /> 6 Tile work,complete with grout 1 LS S 8&000 S <br /> and sealing <br /> 7 Terracotta work,Complete with I LS $ OOp <br /> grout.and sealing <br /> g All plumbing fixtures and required 1 LS $ $ <br /> back supports,venting pipes, 93000 <br /> supply pipes,fountain equipment <br /> and accessories <br /> ---— 9 Service, power,switching, _--- I LS S 18 coo <br /> distribuition,light fixtures,data <br /> and comni uticntion conduits, <br /> control panel,general work _ <br /> l0 As-Built Plans I LS $5,000 $ <br /> II Construction Permit l LS $10,000 $ <br /> TOTAL BASE BID I S 1p3 5 000 -00 <br /> The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br /> right to award the Base Bid,and any, all, or none of the add-alternate bid items(if any). <br /> * The quantity for this bid item is shown for bid comparison only, This bid item shall not he <br /> subject to the"25%"limit as stated in Section 3-2 of the Standard Specifications. The actual <br /> P-8 of P-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.