My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PENNELL CONSULTING, INC.
Clerk
>
Contracts / Agreements
>
P
>
PENNELL CONSULTING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 7:45:52 AM
Creation date
8/26/2024 3:20:29 PM
Metadata
Fields
Template:
Contracts
Company Name
PENNELL CONSULTING, INC.
Contract #
A-2024-128
Agency
Police
Council Approval Date
8/20/2024
Expiration Date
8/19/2027
Insurance Exp Date
4/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />E. Work with Santa Ana Police Department staff to finalize the preferred option for the PSIM and <br />related subsystems and any alternates to be included in the Request for Proposal to follow this <br />assessment. <br />F. Develop a Cost Projection and Schedule Report for services related to the design, building, and <br />implementation of replacement PSIM, including services and work related to the removal of the <br />current jail security and controls system and long-term maintenance services. <br />G. Develop a project timeline estimate based upon Consultant's experience working with similar size <br />projects with municipal clients. <br />H. Integrate knowledge gained from the onsite inspection, needs assessment, PSIM industry <br />capabilities, and create a capabilities specification and scope of work for a replacement PSIM <br />system. Assist with combining the capabilities specification and scope of work to be published as <br />part of the RFP for services of a design/build firm to engineer and install the replacement PSIM <br />system. <br />I. Provide project management services throughout the engineering/construction process, assisting <br />City staff to monitor schedules, timelines, and to observe installation, testing and final acceptance. <br />J. Deliverables <br />1. System Inventory and Assessment Report <br />2. Cost Projection and Schedule Report <br />3. Project Schedule for rollout and implementation <br />4. Recommendation Report for PSIM System Replacement, to include the following at minimum: <br />• Features recommended; <br />• Future replacement scheduels and costs; <br />• Subsystem replacemnert/integration/recommendations <br />• Schematic plan for system modifications <br />• Quality assurances/vendor qualifications <br />5. Development of specifications documents for incorporation into RFP documents, including <br />contractor experience. <br />III. Phase 2: Procurement Phase(s) <br />A. Assist City and act as lead in drafting scope of work for a subsequent Request for Proposals <br />seeking qualified design/build firms to fulfill the needs of the capabilities specification, and provide <br />assistance in evaluating design/build proposals received if needed. <br />City will be the final reviewer of RFP documents, will release documents, and facilitate the <br />solicitation process and communications in accordance with the City's established Purchasing <br />Policies and Procedures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.