My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CITY OF (9)
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CITY OF (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:02:01 AM
Creation date
8/29/2024 11:48:12 AM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A-1997-055
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Comply with all applicable federal, state, and county grant program procedures and <br />requirements for the project; <br />E. Submit to the Garden Grove City Engineer proposed plans and specifications relating <br />to Garden Grove's portion of street work for approval, which approval shall not be <br />unreasonably withheld, prior to initiating the bid process; <br />F. Submit to the Garden Grove City Engineer for approval, which approval shall not be <br />unreasonably withheld, the proposed bid for the Garden Grove portion of the work <br />prior to work beginning; <br />G. Make available at all times during construction of the project physical access to the <br />work site for the purpose of inspection. Garden Grove shall give notice to Santa Ana <br />of any remedial measures it desires undertaken with respect to Garden Grove's portion <br />of the work; <br />H. Furnish to Garden Grove i) one (1) set of original reproducible drawings and ii) one <br />(1) set of "As Built' plans and a detailed statement of construction costs; and <br />I. Retain all records and accounts relating to the project for a period of seven (7) years <br />from date of acceptance for auditing purposes. <br />Section 3. Garden Grove's Obligations. <br />Garden Grove shall; <br />A. Reimburse Santa Ana for Garden Grove's matching share of the construction costs of <br />the street improvements on Euclid Street, which are estimated at two percent (2%) of <br />total project costs, or approximately Forty Thousand Dollars ($40,000.00). <br />B. Reimburse Santa Ana for Garden Grove's matching share of construction engineering <br />and inspections services, which shall not exceed fifteen percent (15%) of Garden <br />Grove's participation in construction costs; and <br />C. Reimburse Santa Ana for Garden Grove's matching share of design, engineering costs <br />incurred in preparation of the plans and specifications, which said amount shall not <br />exceed fifteen percent (15%) of the construction costs within the City of Garden <br />Grove. <br />Section 4. Change Orders <br />Garden Grove shall be given the opportunity to review and approve, which approval shall <br />not be unreasonably withheld, all change orders affecting Garden Grove's portion of the work. <br />Section 5. Billing. <br />Santa Ana may submit to Garden Grove progress billings for construction of the Project. <br />Santa Ana shall present certification and invoices for Garden Grove's share of costs to Garden <br />Grove, and Garden Grove shall reimburse Santa Ana within thirty (30) days following receipt of <br />
The URL can be used to link to this page
Your browser does not support the video tag.