My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CITY OF (10)
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CITY OF (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:00:39 AM
Creation date
8/29/2024 11:49:05 AM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A-1998-139
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WO�'iK MA'Y <br />C E [(K (1) 1- COOPERATIVE AGREEMENT <br />THIS AGREEMENT, made and entered into this 24th day of October, 1998, by and <br />between the CITY OF SANTA ANA, a municipal corporation of the State of California, Post <br />fl Office Box 1988, Santa Ana, California, 92702, hereinafter referred to as "SANTA ANA," and <br />the CITY OF GARDEN GROVE, a municipal corporation of the State of California, P.O. Box <br />3070, Garden Grove, California 92842, hereinafter referred to as "GARDEN GROVE." <br />WHEREAS, Harbor Boulevard between Warner Avenue and Sunflower Avenue lies <br />within Santa Ana; and <br />WHEREAS, GARDEN GROVE AND SANTA ANA have concurred and agreed that <br />smart street improvements of Harbor Boulevard between Warner and Sunflower are needed; <br />and <br />WHEREAS, the work necessary to improve Harbor Boulevard will require the <br />preparation and processing of environmental and technical studies. This work is hereinafter <br />referred to as the PROJECT; and <br />WHEREAS, GARDEN GROVE and SANTA ANA agree that it is in the best public <br />interest that the PROJECT be incorporated into an overall effort to complete environmental and <br />technical studies for the Harbor Boulevard Smart Street between 1-5 and 1-405 and GARDEN <br />GROVE and SANTA ANA will benefit with less disruption to the public and lower overall costs <br />than from separate city professional services agreements; and <br />WHEREAS, the PROJECT has received Measure M funds for environmental work <br />through Growth Management Area (GMA) No. 2, but these funds can only apply within GMA <br />No. 2, which boundary terminates at Warner/Harbor Boulevard; and <br />WHEREAS, SANTA ANA and GARDEN GROVE shall share the responsibility of the <br />PROJECT; mutually desire to cooperate and jointly participate in the environmental work of <br />PROJECT and to specify herein the terms and conditions under which PROJECT shall be <br />financed. <br />AGREEMENT <br />THAT PARTIES MUTUALLY AGREE AS FOLLO\NS: <br />1. GARDEN GROVE is designated as agent for SANTA ANA for the purpose of <br />performing various environmental services such as, but not limited to, preliminary engineering, <br />environmental assessments, and technical report writing with the boundaries of SANTA ANA. <br />2. GARDEN GROVE is designated agent for SANTA ANA for the purpose of <br />preparing environmental impact reports and technical studies and requirements for the <br />PROJECT, <br />1 GARDEN GROVE agrees that environmental impact report shall be submitted for <br />written approval of SANTA ANA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.