Laserfiche WebLink
5. GARDEN GROVE agrees to reimburse SANTA ANA, GARDEN <br />GROVE'S proportionate share of the construction engineering and construction costs, <br />based on the proportion of actual construction costs within the City of Garden Grove <br />limits. <br />With respect to traffic signalization items, the proportion of participation will be <br />based on the existing signal maintenance agreements on the date of execution of this <br />agreement. <br />With respect to storm drain construction, participation will be based upon a 50 <br />percent split between Santa Ana and Garden Grove. <br />b. GARDEN GROVE agrees to pay 100 percent of GARDEN GROVE'S. <br />matching share of the cost of improvements within its jurisdiction on Westminster Avenue. <br />7. Progress billings may be submitted to GARDEN GROVE for right-of-way <br />acquisition and during the design and construction of the PROJECT. SANTA ANA shall <br />present certification and invoices for GARDEN GROVE'S share of costs to GARDEN <br />GROVE, and GARDEN GROVE shall reimburse SANTA ANA within thirty (30) days <br />following receipt of such invoices. Such invoices shall be based on the actual cost of design <br />and construction contract. <br />S. At all times during the construction of said PROJECT, GARDEN GROVE <br />shall have physical access to the worksite for the purpose of inspection. Should GARDEN <br />GROVE deem any remedial measure to be necessary, GARDEN GROVE shall notify <br />SANTA ANA. <br />9. It is understood that SANTA ANA has the right to make routine change <br />orders with the contractor on the work for which it is acting as 'agent for GARDEN <br />GROVE; provided, however, first having approval of GARDEN GROVE, <br />10. GARDEN GROVE shall pay Santa Ana $350,000 for design engineering <br />costs in preparing construction documents for the PROJECT. <br />3 <br />