My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE SANITARY DISTRICT
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE SANITARY DISTRICT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 8:59:59 AM
Creation date
8/29/2024 11:55:46 AM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE SANITARY DISTRICT
Contract #
A-1985-096
Agency
Public Works
Destruction Year
2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Any repair or replacement costing less than $5,000.00 may <br />be done by force account. Repairs or replacements costing in excess of <br />$5,000.00 shall be subject to a public bidding process. <br />If, within 30 days -After notification, _the notified party <br />disagrees with the necessity or estimated cost or apportionment of the cost of <br />the repair or replacement, they shall so notify the other party in writing. If <br />the parties are unable to agree upon the need or cost of the repair or replacement, <br />the matter may be submitted to arbitration as set forth in Section 4. <br />2. Future Sewers <br />It is anticipated that, as the tributary area to the shared sewers <br />continues to develop, there will not be adequate capacity, as defined in Section <br />1, in some of the shared sewers. Exhibit C attached hereto shows the sizes and <br />locations of parallel sewers and relief connections to Orange County Sanitation <br />District facilities that are anticipated will be required in the future to <br />provide capacity for ultimate planned development. <br />On or before October 1st of each year, each party shall determine <br />whether the shared sewers within their jurisdication have sufficient capacity, as <br />defined in Section 1, to provide service without limiting connections for the <br />next calendar year. If it appears that adequate capacity will not be available, <br />then the parties shall meet and determine within 60 days the size and estimated <br />cost of a parallel relief sewer that, together with the existing sewer, will <br />provide adequate capacity for ultimate planned development within the tributary <br />area. Each party shall provide the estimated ultimate flows for their portion of <br />the tributary area. <br />The cost of the new parallel sewer, including engineering, <br />administration and construction shall be apportioned between the parties equal to <br />4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.