My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CIY OF
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CIY OF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:02:06 AM
Creation date
8/29/2024 12:03:53 PM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A-1973-30
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br />THIS AGREEMENT made and entered into this 23rdday of _May____ <br />1973, by and between the City of Garden Grove" a municipal corporation, <br />hereinafter called "GARDEN GROVE" and the City of Santa Ana, a municipal <br />corporation, hereinafter called "SANTA ANA"- <br />NlTNE55ETH THAT: <br />WHEREAS, considerable traffic congestion presently exists and is <br />increasing at the intersection of Euclid Street at Westminster Avenue; <br />WHEREAS, a study has been completed and the conclusion drawn that traffic <br />conditions at the said intersection warrant the intersection to be included within <br />a progression system for the proper and orderly movement of traffic on Euclid <br />WHEREAS, portions of said intersection are within the City boundaries of <br />Santa Ana and of Garden Grove; <br />WHEREAS, it is the desire of the parties hereto to set out their <br />respective rights and obligations concerning the improvement, modification, <br />operation and maintenance of existing traffic signal and lighting system at the <br />intersection of Westminster Avenue and Euclid Street; <br />NOW THEREFORE, for and in consideration of the covenants herein contained, <br />performed and to be performed, the parties hereto agree as follows: <br />l' The parties hereto agree to share the engineering, administration, <br />construction and inspection costs of the installation of the traffic <br />signal modification in the same ratio as the number of legs under <br />each party's jurisdiction entering the intersaofionareto the total <br />number of legs entering the intersection. <br />2- The total cost of said modification project is presently estimated not <br />to exceed $41,500-00 and shall initially be borne by Garden Grove. <br />3' Following completion of construction, Santa Ana shall, upon receipt <br />of proper demand, reimburse Garden Grove in an amount equal to fifty <br />percent (50%) of the total eligible cost' Both Garden Grove and <br />Santa Ana plan to finance their share of the costs for this project <br />with TOPICS funds and City matching funds. It is mutually understood <br />that Santa Ana will only be required to finance that portion of this <br />project where TOPICS and City matching funds are eligible to be <br />jointly used. <br />-l- <br />
The URL can be used to link to this page
Your browser does not support the video tag.