Laserfiche WebLink
A G R E E M E N T <br />THIS AGREEMENT Made and entered into this `/1 <br />day a f b" <br />2 l972, by and between the City of Ga.r.-J.en Grove, a, municipal corporation, <br />3 ereinafter called "CARDEN GROVE" and the City of Santa Aria, a Muni cij..)aJ_ <br />4 porporaticn, hereinafter called "SAETA 1UIA". <br />5 <br />6 WITNESSET11 THAT: <br />7 WHEREAS, no official agreeirie.,nt was made between the parties concerning <br />the improvement, inodificatio-n, operation and maintenance of existing traffic <br />�31.gna.l and Ifight ing system at -the intersection of GJestminster Avenue and Euclid <br />I <br />10 treet after -portion of the intersection had been annexed by SANTA ANA; <br />11 WBEEEAS, a study has been completed and the conclusion drawn that traffi(-.� <br />12 rond.itions at the said. intersection w,,arrant the installaticni of internally- <br />13 ovurheud street nanict signs for the proper and order-I.y movaiment, of <br />14 11raf-, ' " <br />15 WHEREAS, portions of said property are with. -In the City boundaries of <br />_iDEN GROVE; <br />16 1A ANA arido f , GAi <br />17 if WHEREAS, it is the desire of the parties hereto to set out their <br />18 -espectivc- rights and obligat.ions concerning the inprovenprit, rnodificatioii, <br />19 operation arid maintc=nance oP existir-.tg traffic s-ignal and lighting system at the <br />20 ntex-sectian of Westminster Avenue and Eucldd Street; <br />21 HOW THEREFORE,, for and in cons j.dera_-it,-ion of the, convenants here.1ri <br />22 ontained, performed and to be pex-formed, th.e pa-r-ties he.ret-o agree as fol1c)ws. <br />*2 3 1. The parties hereto agree to share the engineering, admin.i.stration, <br />24 construction and inspection costs of' tiic installation of internally- <br />25 il.Lirninated overhead street, name signs in -the same ratio as the <br />26 nunl)er of legs under each I raxty's jurisd-lction entering the <br />27 intersection are to the total number of iegs entering the inLersection. <br />28 The total cost of said signing project, -is pi-esently estimated r[r,)t <br />29 to exceed $3,000.00 and shall initially be borne by SPINTA AEA, <br />30 3. Following completion of construction, GAHDEN GROVE, sliall, qpoo rec,,.ipt <br />31 -)f Proper demand, SI1d1'11A ANA in an amount equal. to severity- <br />32 five percent ('T'.)%) of the total elig.ible cost. GARDEN GROVE also <br />