My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JENSEN HUGHES, INC. (3)
Clerk
>
Contracts / Agreements
>
J
>
JENSEN HUGHES, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 2:16:13 PM
Creation date
8/29/2024 1:58:16 PM
Metadata
Fields
Template:
Contracts
Company Name
JENSEN HUGHES, INC.
Contract #
N-2024-295
Agency
Public Works
Expiration Date
6/30/2025
Insurance Exp Date
6/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana ADA Self -evaluation and Transition Plan Update Assistance <br />Services <br />We will conduct Barrier Assessment Surveys and reviews of selected public facilities and public rights -of -way <br />and develop Access Compliance Assessment Reports (ACAR) in electronic copies (PDF and Excel spreadsheet <br />format for any buildings, parks, and PROW selected for this projet scope) for the City's use. This report will <br />include a summarization of estimated costs for each City building and area assessed, as well as the following <br />information (at minimum) for each individual barrier/finding identified: <br />Record Unique number identifier tied to a specific record/barrier in the report. <br />Number: <br />Location: Specific area within the City in which the barriers identified in the report can be found for that section, i.e., <br />facilities, street names, and/or GPS data. <br />................................ _.............................................................................................. ....................................................................................... ................................ <br />Element., Accessibility category that the identified barrier pertains to. <br />................................ _................................................................................................................................................................................................................. <br />.... <br />Barrier Detailed statement regarding the physical barrier and the specific applicable accessibility standard being <br />Description: applied. <br />................................ _............................................................................................................ .................................................................. ....................................... <br />As Built: Measurement/Description of the existing conditions at the time of evaluation (where available). <br />................................_..................................................................................................................................................................................................................... <br />Photograph: Digital photo documenting the identified barrier at the time of evaluation (where available). <br />Proposed Information regarding the most feasible method/modification for performing the barrier removal (Solution <br />Solution: may either be physical or programmatic in nature). <br />.............................................................................................................................................................................................................................................................. <br />Code Citations from applicable standards related to the barrier's noncompliance, including: 2010 ADA <br />References: Standards for Accessible Design (ADA 2010), 2011 PROWAG, CA MUTCD, and Chapter 11 B of the <br />CBC. <br />................... .................. _............................................................................................................................ .......................................................................... I—-........... <br />Priority Criteria to be developed with City approval during the project which will rank individual barriers in order of <br />importance to remediate. By default, this will consider factors such as the severity of an individual barrier <br />and As location within a building or area. <br />............. ..... ................... _........................................................................................................................................................... ............................................................ <br />Quantity: Number of units needed to remediate the barrier (for cost estimating purposes). <br />..................................... _......... ...................................... ........................................................................................................................................................................ <br />Units: Unit of measurement related to the quantity provided (for cost estimating purposes). <br />............. ........................ ..................................................................... ....... ................................................................................................ ............................................ <br />Unit Cost: Cost per Units to remediate the barrier based on the Proposed Solution (for cost <br />estimating purposes). Cost opinions are calculated primarily based on RSMeans 2020 Construction Cost <br />data for Building Construction and Interiors which includes factors such as: <br />+Cost of materials/equipment to perform the remediation <br />+Manual and/or skilled labor cost to perform the remediation <br />+Demolition and hauling of existing materials <br />+20% contingency markup <br />+10% overhead and profit (O&P) markup <br />+(23.5%) location factor multiplier (can be adjusted as necessary) <br />.......... ......... ............. ..... _.......................... ........................ ....................................................................... ...................................... .............................................. <br />.......... <br />Total Cost Product of Quantity surveyed and Unit Cost to remediate the As -Built identified (for cost estimating <br />(Estimate): purposes) <br />New evaluations of City facilities will then become a component of part of the ADA Transition Plan process <br />covering the evaluation of physical accessibility requirements under Title II of the ADA. <br />Page 4 1 February 22, 2023 1 Rev. 0 Copyright 92023 Jensen Hughes, Inc. <br />All Rights Reserved. T0822 <br />
The URL can be used to link to this page
Your browser does not support the video tag.