My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GROUP 4 ARCHITECTURE, RESEARCH + PLANNING, INC.
Clerk
>
Contracts / Agreements
>
G
>
GROUP 4 ARCHITECTURE, RESEARCH + PLANNING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:04:15 AM
Creation date
8/29/2024 2:14:52 PM
Metadata
Fields
Template:
Contracts
Company Name
GROUP 4 ARCHITECTURE, RESEARCH + PLANNING, INC.
Contract #
A-2024-127
Agency
Library
Council Approval Date
8/20/2024
Expiration Date
4/18/2024
Insurance Exp Date
7/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSURANCE NOT ON FILE <br />WORK MAY NOT PROCEED <br />CITY CL4� 2 y 1�14 <br />DATE: A <br />v LO(E) <br />(Ner;a Paalw),wV' <br />A-2024-127 <br />THIS FIRST AMENDMENT to the above -referenced agreement is entered into on August 20, <br />2024, by and between Group 4 Architecture, Research + Planning, Inc., a California corporation <br />("Consultant"), and the City of Santa Ana, a charter city and municipal corporation organized and <br />existing under the Constitution and laws of the State of California ("City"). <br />RECITALS <br />A. Following Request for Proposal ("RFP") No. 21-118, the parties entered into Agreement <br />No. A-2022-060 ("Agreement") dated April 19, 2022, to retain a qualified consultant <br />having special skill and knowledge in the field of library renovation to prepare full <br />conceptual plans for the Santa Ana City Library. <br />B. To support extensive upgrades during the renovation, on December 21, 2022, the City <br />approved a reallocation of scope and fees that deferred Task 5 of the scope of work to the <br />Agreement, which included bidding, construction administration, and record drawings. <br />C. The Agreement is in full force and effect through April 18, 2025. <br />D. With the award of a contract for construction, the City now desires to reinstate the original <br />Task 5 services that were deferred on December 21, 2022 and include Additional Services <br />Requests within the scope of work. <br />E. The parties now wish to amend the Agreement to expand the scope and increase <br />compensation. <br />The Parties therefore agree: <br />Section 1, Scope of Services, is hereby amended to include Exhibit A-1 of this First <br />Amendment. This amended scope of services includes: <br />a. Additional Service Request ("ASR") 04 Reinstated Task 5 Construction <br />Administration ("CA"). With the award of a contract for construction, the City now <br />desires to reinstate the original Task 5 services that were deferred on December 21, <br />2022. ASR 04 reinstates these services. <br />b. ASR 05 Supplemental Services for Historic Restoration. As part of ASR 03 <br />Materials Testing — the historic specialist, Page & Turnbull, has developed an <br />extensive marble restoration repair and rehabilitation scope. For a new ASR 05 <br />Page & Turnbull has proposed a scope of services that can be provided as directed <br />by the City on a time and material basis. Page & Turnbull Task 5 services have <br />been removed from ASR 04 and ASR 07 and are fully provided for in ASR 5. <br />c. ASR 06 Existing Elevator Evaluation and Repair Recommendations. The City has <br />requested that the existing elevator be evaluated by a specialty sub -consultant to <br />determine the scope of repairs needed. Through ASR 06, the services of J.E. Sellen <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.