My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GROUP 4 ARCHITECTURE, RESEARCH + PLANNING, INC.
Clerk
>
Contracts / Agreements
>
G
>
GROUP 4 ARCHITECTURE, RESEARCH + PLANNING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:04:15 AM
Creation date
8/29/2024 2:14:52 PM
Metadata
Fields
Template:
Contracts
Company Name
GROUP 4 ARCHITECTURE, RESEARCH + PLANNING, INC.
Contract #
A-2024-127
Agency
Library
Council Approval Date
8/20/2024
Expiration Date
4/18/2024
Insurance Exp Date
7/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G R O U P 4 <br />13 June 2024 <br />_ -1 R <br />A R C H I T E C T U R E <br />Jason Gabriel <br />City of Santa Ana <br />CLIENT CONTR #: <br />A-2022-060 <br />R E5 EA RCIt + <br />PLANNING, INC <br />Public Works Agency <br />ADD SERVICE #: <br />06 Exist Elevator <br />Survey <br />20 Civic Center Plaza PO Box 1988 <br />211 LINDEN AVENUE <br />Santa Ana, CA 92702 <br />BILLING TYPE: <br />Lump Sum & T&M <br />SO. SAN FRANCISCO <br />PROJECT NAME: <br />G4 PROJECT #: <br />GROUP 4 PHASE #: <br />CA 94080 USA <br />Santa Ana Library Renovation <br />22575-01 <br />106 <br />T:650•871.0709 <br />SCOPE SUMMARY: <br />F: 6 5 0 • 8 7 1 • 7 91 1 <br />Evaluation of existing passenger elevator, preparation of bid allowance <br />recommendations, and supplemental services. <br />specification, repair <br />ww w. aa rc h. cum <br />ADD SERVICE <br />LUMP 5UM <br />FEE <br />MARKUP <br />EXTENSION <br />Elevator Allowance Specification J.E. Sellen <br />$2,440 <br />$244 <br />$2,684 <br />On -Site elev. Evaluation incl travel J.E. Sellen <br />$7,910 <br />$791 <br />$8,701 <br />TIME & <br />MATERIAL FEE <br />ADD SERVICE <br />NTE <br />MARKUP <br />EXTENSION <br />_ <br />Other Repair support services J.E. Sellen <br />$7,500 <br />$750 <br />$81250 <br />DESIGN FEE SUB -TOTAL: $19,635 <br />6/13/2024 <br />David Schnee Date <br />Principal in Charge <br />Jason Gabriel Date <br />Acting City Engineer <br />G:\22575-01 Santa Ana Library\Y-Contract\CLIENT\Amendment\Amendment 12024-XX-XX\Draftto City 2024-06-13\Santa Ana Fee -hours 2024-06-13 Amendment 01 <br />ASR 06 Exist Elev S2024-06-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.