My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-3068 - Zoing Amendment for South Coast Technology Center
Clerk
>
Ordinances
>
2021 - 2030 (NS-3001 - NS-XXXX)
>
2024 (NS-3055 - NS-XXX)
>
NS-3068 - Zoing Amendment for South Coast Technology Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 4:43:08 PM
Creation date
8/29/2024 3:36:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Agency
Clerk of the Council
Doc #
NS-3068
Date
8/20/2024
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation Demand Management Program and other mitigation measures as <br />specified in the Environmental Impact Report, or prepared CEQA Exemption <br />15183 Environmental Documentation. <br />2. Each future structure(s) shall be required to demonstrate conformity with the <br />applicable provisions of this Specific Development Plan SD-58 Plan and certified <br />Environmental Impact Report, or prepared CEQA Exemption 15183 Environmental <br />Documentation, to provide the opportunity to apply conditions to ensure <br />compliance. <br />3. Prior to issuance of a Utility Release complete the following: <br />a) Comply with all mitigation measures applicable to the approved Site Plan and <br />as set forth in the Draft EIR and as modified in the response to comments <br />portion of the EIR. <br />b) Comply with the requirements of the Development Agreement, as applicable. <br />4. Any amendments and/or modifications to the project or site plan review approval <br />per Development Project (DP) DP No. 2023-37, including modifications to approved <br />materials, finishes, architecture, site plan, landscaping, and square footages must <br />be submitted to the Planning Division for review. At that time, staff will determine if <br />administrative relief is available, per the following: <br />a. Modifications up to ten -percent (10%) deviations shall be reviewed and <br />approved by the City of Santa Ana's Planning Manager. <br />b. Modifications up to twenty -percent (20%) deviations shall require a <br />discretionary review and approval of a minor exception application by the <br />City of Santa Ana's Zoning Administrator, at a duly noticed public hearing, <br />pursuant to all applicable requirements outlined in the SAMC. <br />c. Modifications exceeding twenty -percent (20%) deviations shall require a <br />discretionary review and approval by the City of Santa Ana's Planning <br />Commission, at a duly noticed public hearing, pursuant to all applicable <br />requirements outlined in the SAMC. <br />5. Prior to the issuance of building permits for any building within the parcels illustrated <br />on Figure 1 (the "Limited Light Industrial Parcels"), a detailed and comprehensive <br />Landscape Plan shall be submitted to the Planning and Building Agency Executive <br />Director or his/her designee for review and approval prior to the issuance of building <br />permits. <br />a. The plan shall comply with the City's Water Efficient Landscape Ordinance <br />(WELD) Chapter 41, Article XVI of the SAMC. The plan shall include an <br />irrigation system layout with the location of controllers and points of <br />Ordinance No. NS-3068 <br />Page 13 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.