Laserfiche WebLink
FEES and PAYMENTS <br />Our preliminary estimate of fees is Five Hundred Five Thousand Five Hundred Dollars ($505,500.00). The <br />design fee for the bridge assumes spanning to an existing higher level, eliminating the need for elevator and stairs <br />at the end. This scope can be determined later once the discovery of the issues are clearer. The fee breaks down <br />as follows: <br />Pre -Construction Phase <br />Pre --Design & Programming $ 5,000 <br />Preliminary Estimate $ 6,500 <br />Functional & Preliminary Design $ 38,800 <br />Design Development $ 62,020 <br />Construction Documentation $ 90,360 <br />Bidding $ 14,120 <br />Allowance for Demolition of Juvenile Detention Facility $ 125,000 <br />Subtotal Pre -Construction Phase $ 341,800 <br />Construction Phase <br />Construction Administration (Designer) $ 38,700 <br />Construction Management Fee $ 125,000 <br />Post -Construction Phase (Cost of the Work) $ 0 <br />Subtotal Construction Phase $ 163,700 <br />Total Pre -Construction and Construction $ 505,500 <br />(including Allowance for demo of Juvenile Detention Facility) <br />Fees by Discipline: <br />Geotechnical <br />$ <br />8,000 <br />Civil (Pad design, no survey) <br />$ <br />6,000 <br />Landscape Architecture <br />$ <br />13,000 <br />Parking Consulting <br />$ <br />28,000 <br />Architectural Design <br />$ <br />88,000 <br />Structural Engineering <br />$ <br />58,000 <br />Mechanical Engineering <br />$ <br />11,000 <br />Electrical Engineering <br />$ <br />13,000 <br />Construction Management (Includes Pre -construction) <br />$ <br />137,500 <br />Architectural Renderings <br />$ <br />8,000 <br />Printing & Expenses <br />$ <br />10,000 <br />Allowance for demolition of Juvenile Detention Facility <br />$ 125,000 <br />Total <br />$ <br />505,500 <br />Not included above is the cost of testing and inspection. This should be a part of your construction budget, and <br />will be billed at actual cost. The extent of testing required has not been determined. However we recommend an <br />allowance of 1% of the construction cost. <br />Hourly Rates: CPC — Parking Consultant/Architect <br />Principal - Parking Consulting $ 185.00 <br />Principal — Architectural design $ 165.00 <br />Project Management $ 135.00 <br />Project Architect $ 115.00 <br />Technician $ 75.00 <br />Clerical/Field Enumerator $ 50.00 <br />Page 2 of 2 <br />