My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GORDON & WILLIAMS INC.
Clerk
>
Contracts / Agreements
>
G
>
GORDON & WILLIAMS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 11:16:53 AM
Creation date
9/5/2024 12:17:57 PM
Metadata
Fields
Template:
Contracts
Company Name
GORDON & WILLIAMS INC.
Contract #
A-2002-144A
Agency
Public Works
Council Approval Date
7/15/2002
Expiration Date
9/1/2007
Insurance Exp Date
6/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGNIBUILD OVERVIEW <br />The Gordon & Williams Design/Build Team consists of Gordon & Williams in the dual <br />roles of Design/Builder and Construction Manager and Choate Parking Consultants as <br />Parking Architect & Consultant and overall Design Team leader. <br />This team was carefully chosen for two main reasons. The first is the impressive list of <br />experience the team member firms have on significant parking structures, mostly here in <br />the Los Angeles basin, experience which will allow the City of Santa Ana to capitalize on <br />lessons learned. The second reason for inclusion on the team is the familiarity the firms <br />and personnel have with each other from past experience on multiple projects. <br />The following pages within this Section give an overview of each individual firm, the <br />main duties and responsibilities each will have on the City of Santa Ana Parking <br />Structure within the team structure, and three (3) references for each of the member <br />firms. Each of the firms is described on a separate page with all of the described <br />information. The final page of this Section is a preliminary Organization Chart of our <br />Design/Build Team, which gives a visual reference for understanding how our team <br />interacts and what the reporting relationships are as we now see them. <br />The proposal that follows has been constructed with attention to answering specific <br />points and issues that were made clear and relevant in your RFQ. It is important to the <br />Gordon & Williams Team to make it apparent to the City of Santa Ana that we meet and <br />exceed the criteria for selection. Please note the following specific and significant items: <br />• Our Team members have significant and relevant experience on both large and <br />small parking structures for public entities. <br />• Our Team, individually and collectively, has all the necessary resources to <br />undertake and execute this project immediately, and do so exceeding the City's <br />expectations for communication, process and performance. <br />• We have a demonstrated success record for delivering exceptional projects in <br />a timely and cost effective manner. <br />• Our Team has a clear organizational structure, as represented on our Org <br />Charts, and has worked effectively together in the past. We have shown the <br />ability and willingness to communicate effectively with our clients and those <br />with whom they deal and serve. <br />• We enjoy an industry wide reputation for the exceptional quality of our work <br />product and for the process through which we arrive at the result. <br />• Our proactive approach to project management, including cost and schedule <br />control, is undisputed. <br />• Our Team member firms are located close to one another, are currently working <br />together on other projects, and have ease in moving back and forth between <br />offices. <br />• We are proud of our reputation for delivering projects ahead of schedule, even <br />in circumstances where it seemed almost impossible. Our clients will attest to it. <br />
The URL can be used to link to this page
Your browser does not support the video tag.