Laserfiche WebLink
PROJECT TEAM <br />Choate Parking Consultants <br />Desfgn <br />F&W I I I B i? Assoc. <br />Structuml Merhanfcaf <br />Group Delta Lynn Capouya <br />Soks Engineer I I Landscape <br />SUPPORT STAFF <br />oM8 <br />Electrical <br />Gordon & Williams <br />Desfga/Eailder <br />TBD <br />civil <br />CHOATE PARKING CONSULTANT'S; INC.: <br />Gordon & Williams <br />conshwilon Manager <br />Preconstruction Project <br />Director -- Manager <br />Hakim Khalif John Staff <br />Waring <br />Project Manager/Architect: Barry Richmond, R.A. <br />Responsible for the design team management, the incorporation and coordination of the team for <br />the Schematic Design, Design Development and Construction Documents. Barry will coordinate <br />the preparation and development of the Project Construction Specifications. <br />Assistant Project Manager: Arturo Levenant Jr., R.A. <br />Art assists the Project Manager in his responsibilities pertaining to the coordination of parking <br />facility construction documentation and construction administration tasks. <br />Project Designer: Fernando Sanchez <br />Responsible for parking facility functional design, schematic design, design development and <br />preparation of each design phase presentation. <br />Director of Operations: Emerson Flint <br />Directly responsible for production of documents for the parking facility throughout the project. <br />Responsible for the production of Concept Drawings, Design Development Drawings and <br />Construction Drawings and shop drawing review during the construction phase. <br />