My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GORDON & WILLIAMS INC.
Clerk
>
Contracts / Agreements
>
G
>
GORDON & WILLIAMS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 11:16:53 AM
Creation date
9/5/2024 12:17:57 PM
Metadata
Fields
Template:
Contracts
Company Name
GORDON & WILLIAMS INC.
Contract #
A-2002-144A
Agency
Public Works
Council Approval Date
7/15/2002
Expiration Date
9/1/2007
Insurance Exp Date
6/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TEAM <br />Choate Parking Consultants <br />Desfgn <br />F&W I I I B i? Assoc. <br />Structuml Merhanfcaf <br />Group Delta Lynn Capouya <br />Soks Engineer I I Landscape <br />SUPPORT STAFF <br />oM8 <br />Electrical <br />Gordon & Williams <br />Desfga/Eailder <br />TBD <br />civil <br />CHOATE PARKING CONSULTANT'S; INC.: <br />Gordon & Williams <br />conshwilon Manager <br />Preconstruction Project <br />Director -- Manager <br />Hakim Khalif John Staff <br />Waring <br />Project Manager/Architect: Barry Richmond, R.A. <br />Responsible for the design team management, the incorporation and coordination of the team for <br />the Schematic Design, Design Development and Construction Documents. Barry will coordinate <br />the preparation and development of the Project Construction Specifications. <br />Assistant Project Manager: Arturo Levenant Jr., R.A. <br />Art assists the Project Manager in his responsibilities pertaining to the coordination of parking <br />facility construction documentation and construction administration tasks. <br />Project Designer: Fernando Sanchez <br />Responsible for parking facility functional design, schematic design, design development and <br />preparation of each design phase presentation. <br />Director of Operations: Emerson Flint <br />Directly responsible for production of documents for the parking facility throughout the project. <br />Responsible for the production of Concept Drawings, Design Development Drawings and <br />Construction Drawings and shop drawing review during the construction phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.