Laserfiche WebLink
SUBTOTAL PARKING STRUCTURE <br />$3,471,153 <br />SUBTOTAL PARKING STRUCTURE & SITEWORK <br />_ �4.763,141 <br />GENERAL LIABILITY INSURANCE <br />$47,631 <br />PERMIT FEES <br />BY OWNER <br />STAFFING & SITE EXPENSES <br />$329,659 <br />PRE -CON PHASE <br />PARKING CONSULTING <br />$30,000 <br />ARCHITECTURAL DESIGN <br />$135,800 <br />STRUCTURAL DESIGN <br />$67,900 <br />MECHANICAL, PLUMBING, AND ELECTRICAL <br />$29,050 <br />LANDSCAPE DESIGN <br />$18,850 <br />CIVIL ENGINEERING DESIGN <br />$34,829 <br />GEOTECHNICAL INVESTIGATION (SOIL REPORT) <br />$8,200 <br />ARCHITECTURAL RENDERINGS <br />$14,000 <br />PRINTING & EXPENSES <br />$13,000 <br />DEMOLITION OF JUVENILE HALL. ALLOWANCE <br />$125,000 <br />CONSTRUCTION PHASE <br />CONSTRUCTION ADMINISTRATION ( DESIGNER) INCLUDED <br />CONSTRUCTION MANAGEMENT FEE $125,000 <br />TESTING & INSPECTION, ALLOWANCE $50,000 <br />GRAND TOTAL $5 792,060 <br />THIS BUDGET IS PREPARED WITH THE UNDERSTANDING THAT THE QUALIFICATIONS <br />ATTACHED AS ATTACHMENT I HERETO, ARE PART OF THE BUDGET FOR THE PROJECT. <br />