My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIRST AMERICAN FINANCIAL CORPORATION (4)
Clerk
>
Contracts / Agreements
>
F
>
FIRST AMERICAN FINANCIAL CORPORATION (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:51:37 PM
Creation date
9/5/2024 1:57:00 PM
Metadata
Fields
Template:
Contracts
Company Name
FIRST AMERICAN FINANCIAL CORPORATION
Contract #
A-1999-065
Agency
Public Works
Destruction Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />LEVEL I - 810,000 square feet <br />Cost Estimate <br />Description of Improvements <br />Developer• Other <br />1A2 Provide eastbound widening on MacArthur to form the <br />160,000 <br />continuation of the number 3 eastbound lane, east of <br />Hutton Center Drive directly into the southbound SR-55 <br />on -ramp eliminating the current "pinch". <br />I C Complete Columbine widening to four lanes including landscaped <br />340,000 <br />median, street lights, sidewalk & parkway landscaping. <br />IN* <br />At southeast comer Main/MacArthur intersection, add a northbound right <br />200,000 <br />turn lane. Right-of-way and construction costs are to be shared with <br />Hutton Center Development. <br />2A1 & 2A2 <br />Route the southbound SR-55 off -ramp, desiring to travel west <br />300,000 <br />west on MacArthur Blvd. through an enlarged signalized inter- <br />section rather than long the existing right -turn diagonal roadway. <br />These improvements will require the addition of two lanes and <br />the modification of the traffic signal. These improvements will <br />require Caltrans approval. <br />2D <br />Widen MacArthur Blvd. to add a third westbound lane between <br />400,000 <br />the southbound SR-55 Freeway off -ramp and the full width <br />improvement east of Imprerial Promendade. Resurface/reconstruct the <br />westbound lanes on MacArthur Blvd. between Main Street and the <br />southbound SR-55 off -ramp per the material report. This work must <br />be coordinated with Caltrans and may need to be constructed <br />in two phases. <br />1 L <br />At SR-55 northbound off -ramp to Dyer add a third lane to off -ramp. <br />100,000 <br />On -site improvements: <br />1,427,530 <br />Cap First American Way with asphalt concrete between Imperial <br />Promenade and existing terminus. Construct storm drain from Orange <br />County Flood Control Channel to Columbine and between First American <br />Way and Orange County Flood Control Channel; reactivate traffic signal <br />at First American Way and Imperial Promenade including loops on west- <br />bound approach, signal modification to provide northbound right turn <br />overlap with westbound left turn and restriping; construct First American <br />between existing terminus and Columbine and Majestic between <br />Majestic East and First American Way". The construction of First <br />American Way and Majestic shall inc➢ude four lanes, landscaped <br />medians, street lights, sidewalks and parkway landscaping. <br />SUBTOTAL <br />2,367,530 <br />560,000 <br />George/Fatco.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.