My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GUZMAN, SILVINO, JOSEFINA AND EFRAIN (2)
Clerk
>
Contracts / Agreements
>
G
>
GUZMAN, SILVINO, JOSEFINA AND EFRAIN (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 5:11:16 PM
Creation date
9/5/2024 2:11:53 PM
Metadata
Fields
Template:
Contracts
Company Name
GUZMAN, SILVINO, JOSEFINA AND EFRAIN
Contract #
A-1979-133B
Agency
Community Development
Destruction Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLE 2ES0L[JTI0N NG, 83® 78 �wp <br />11TEEtfENT WITH GRYIP JW CABLE ROR <br />OVERHEAD .4I3 UNDERGROUND CABLE <br />p3�h <br />CRY P iMAGER I CLERK OF THE COYNOL <br />G� I £: <br />RECOW95NDED ACTION <br />That the City Council adopt a resolution authorizing an exemption to the bidding <br />process, and 2) adopt and execute an agreement with Group W Cable, !no., for <br />overhead and underground cable installation services. <br />EXECUTIVE U M <br />hi wi wn c_=.jvh e the Computerized Traffic Signal System, the Transportation <br />Eepar went is installing traffic signal interconnect cable wherever practical. This <br />cable is intended to link most of the major traffic signals in the City with the <br />central canputer system. In lieu of paying underground construction permit fees, <br />Group W Cable has offered to offset the value of the permit fees against the value <br />of the overhead and underground cable installation services that it would provide. <br />The estimated value of the permit fees in question is $30,232. The estimated value <br />of overhead and underground cable installation services to be provided is $27,682. <br />If the value of the services provided by Group W Cable is less than the value of the <br />permit fees, Group W Cable will pay the difference- If it is the contrary, the City <br />will pay the difference. vpproval of this action would not in any way eliminate <br />Group IMF Cable's responsibility toward applying and meeting the City's construction <br />permit obligations. Refer to Exhibit A for a preliminary listing of propose.; <br />traffic signal interconnect facility locations. <br />The City would basically be paying for the cost of the materials and same minimal <br />labor charges. Normally, the City would have installed the cable underground; <br />however, because Group W Cable is installing over --ground and underground cable, r_.e <br />City has elected to have its cable installed over -ground and undergrounh it is <br />estimated that if the City were to 100 percent install the cable underground, that <br />it would cost $300,000. Thus, the potential savings of this action, if approved, <br />would be in the vicinity of $270,OOO. Ai�i offer of this nature codes very seldan. <br />i � -`) <br />--- cc; Z <br />Immediate approval of this action is nondssary in view that Group W Cable has <br />already commenced construction of the Santa Ana WTu System@ c delay of this action <br />;Mould reduce any potential savings that the City would receive, <br />ALTERNATIVE <br />Initiate a bid call for the installation of underground cable The estimated - <br />project cost is $300,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.