Laserfiche WebLink
(9) <br />CITY OF SANTA ANA <br />4. WORKMANSHIP AND SUPERVISION <br />Work shall be performed by competent and experienced workers. The work force shall <br />include a thoroughly skilled, experienced, and competent supervisor who shall be <br />responsible for adherence to the specifications. <br />All personnel shall be neat in appearance and in uniforms. All personnel shall wear <br />identification badges or patches. Those employees working in or adjacent to traffic lanes <br />shall wear safety vests and follow all necessary safety procedures at the facilities. <br />Persons employed by the Contractor who are found not to be satisfactory by the City shall <br />be discharged or reassigned by the Contractor on fifteen (15) days' notice from the City. <br />5. SAFETY REQUIREMENT <br />The contractor shall provide a safety data sheet (SDS) for all chemicals including but not <br />limited to pesticides, herbicides, etc. to the City of Santa Ana prior to utilization. <br />All work performed under this contract shall be performed in such a manner as to <br />provide maximum safety to the public and where applicable, comply with all safety <br />standards required by CAL -OSHA. The City of Santa Ana reserves the right to issue <br />restraint or cease and desist orders to the Contractor when unsafe or harmful acts are <br />observed or reported relative to the performance of the work under this contract. All <br />contractor vehicles shall have a "W.A.T.C.H." work area traffic control manual at all <br />times. <br />The Contractor shall maintain all work sites free of hazards to persons and/or property <br />resulting from his/her operations. Any hazardous condition noted by the Contractor, which <br />is not a result of his/her operations, shall be immediately reported to the City of Santa <br />Ana. The City can cancel or stop work at any time when the safety of the Contractor, the <br />public, etc. is compromised. <br />The contractor shall assure that each employee or subcontractor under the contractor's <br />supervision is trained in the work practices necessary to safely perform his or her job. The <br />contractor will assure that each employee or subcontractor under the contractor's <br />supervision is instructed in the known potential hazards related to his or her job. The <br />contractor shall assure that each employee or subcontractor under the contractor's <br />supervision follows safety rules and safe work practices. <br />6. SCHEDULES <br />6.1. ANNUAL SCHEDULE <br />• The annual schedule shall be submitted for City approval within fifteen (15) <br />calendar days after effective date of the contract. <br />• The Contractor shall submit revised schedules when actual performance differs <br />substantially from planned performance. <br />