My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Agreement with TSG Enterprises, Inc. DBA The Solis Group for Labor Compliance
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 14 - Agreement with TSG Enterprises, Inc. DBA The Solis Group for Labor Compliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:06:03 AM
Creation date
9/11/2024 9:09:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana - RFP No. 24-084 <br />Labor Compliance & Community Workforce Agreement <br />Professional Administrative Services <br />Prepare a Project Closeout Report outlining obstacles, violations, services <br />performed, and final percentages achieved by workforce type (Santa Ana, <br />Project Manager: 1 hour <br />Analyst: 2 hours <br />Orange County, Veterans, and Non -Local). <br />Prepare Annual Report summarizing all CWA activity (planned, active, and <br />Project Manager: 2 hours <br />completed projects), to present to City Council and residents of Santa Ana. <br />Analyst: 3 hours <br />Author updates to CWA Compliance Packet to assist Contractors in <br />Project Manager: 2 hours <br />complying with the CWA, as needed. <br />Analyst: 2 hours <br />Author updates to CWA Policies and Procedures manual as a guide for CWA <br />Project Manager: 2 hours <br />administration duties. <br />Analyst: 2 hours <br />Train City staff, and those identified by the City, on implementation of CWA <br />Project Manager: 4 hours <br />by developing educational material and presentations. <br />Analyst: 8 hours <br />Conduct CWA orientation for Contractors, as needed. <br />Project Manager: 2 hours <br />Analyst: 4 hours <br />Act as the City's authorized representative and liaison between the City, <br />Contractors, and other agencies, coordinating all labor compliance <br />Project Manager: 2 hours <br />Analyst: 1 hour <br />activities. <br />Attend Pre -Bid and/or Pre -Construction meetings to provide an overview of <br />(Project -Specific) <br />Project Manager: 3 hours <br />the labor compliance requirements that the Contractor must follow. <br />Analyst: 5 hours <br />Assist and advise City staff in the preparation of the labor compliance <br />Project Manager: 3 hours <br />section of project specifications and bid packages. <br />Analyst: 1 hours <br />In accordance with the Caltrans Local Assistance Procedures Manual <br />(LAPM), collect, review, and verify all Certified Payroll Reports (CPR) against <br />(Monthly) <br />Project Manager: 2 hours <br />the prevailing wage rates. Create and maintain a database to <br />Analyst: 5 hours <br />encompass all labor compliance. <br />Ensure Apprenticeship requirements are met per projct specifications. <br />Project Manager: 1 hourAnalyst: <br />2 hours <br />Perform regular site interviews of Contractor's employees for wage rate <br />Site Interviewer: 2 hours <br />verification in accordance with the Caltrans LAPM. <br />Prepare a Project Closeout Report outlining any deficiencies, any/all CPRs, <br />Project Manager: 1 hour <br />interview records, claims, and any final labor compliance reports. <br />Analyst: 2 hours <br />Train City staff, and those identified by the City, on implementation of labor <br />Project Manager: 4 hours <br />compliance by developing educational material and presentations. <br />Analyst: 8 hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.