My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 13-6792; FEDERAL PROJECT NO.: DEM06L-5063(146), CML 5063(210) <br />BRISTOL STREET IMPROVEMENTS AND WIDENING FROM CIVIC CENTER DRIVE <br />TO WASHINGTON AVENUE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />17 <br />Colored Concrete - Brick Red, Topeast <br />1,540 <br />SF <br />$ <br />$ <br />Exposed Aggregate Finish (TW4") <br />I z � <br />18 <br />Concrete Bus Pad <br />2,750 <br />SF <br />$ 2 _ <br />$ I_ -9756 <br />19 <br />PCC Protected Bike Lane (6") — Detail B <br />2,228 <br />LF <br />$ <br />$3Z3Vo <br />)45- <br />b <br />20 <br />PCC Protected Bike Lane at Bus Island (6") — <br />150 <br />LF <br />$ <br />$ <br />Detail F <br />b— <br />-3 7�� "- <br />21 <br />Furnish and Install New Water Valve Frame <br />7 <br />EA <br />$ <br />$ <br />and Cover <br />aft <br />1-� nb J <br />22 <br />Furnish and Install Survey Monument to <br />2 <br />EA <br />$ <br />$ <br />Finished Grade <br />uov <br />4400 — <br />23 <br />Adjust Sewer Manhole to Finished Grade <br />2 <br />EA <br />$ <br />$ <br />24 <br />Adjust Sewer Cleanout Frarne and Cover to <br />5 <br />EA <br />$ <br />$ <br />Finished Grade <br />t 7 —j <br />25 <br />Culvert Cleanout Type A <br />1 <br />EA <br />$ -_ <br />$ <br />7LW '- <br />26 <br />Traffic Signal Modification at Bristol St and <br />1 <br />LS <br />$ <br />$ <br />Washington Ave <br />g <br />�LlO W0 <br />ffj i A <br />27 <br />Traffic Signal Modification at Bristol St and <br />1 <br />LS <br />$ <br />$ <br />Civic Center Dr. <br />S <br />28 <br />Install 2" PVC Conduit per Plan <br />230 <br />LF <br />$ <br />$ <br />70 _ _ <br />1(ar u _ <br />29 <br />Install 3" PVC Conduit per Plan <br />60 <br />LF <br />$ <br />$ <br />30 <br />Install 4" PVC Conduit per Plan <br />1,250 <br />LF <br />$ <br />$ <br />%S� <br />'�337$t^. <br />31 <br />Install No. 6 Pull Box <br />4 <br />EA <br />$ <br />$ <br />32 <br />Install No. 6E Pull Box <br />5 <br />EA <br />$ <br />$ <br />33 <br />Install Traffic Signal Loop Detector (Type E <br />6 <br />EA <br />$ <br />$ <br />Loop) <br />12 <br />34 <br />Install IP Communication System <br />1 <br />LS <br />$ <br />$ <br />35 <br />Install 144 Strand SMFO Cable <br />2,500 <br />LF <br />$ <br />$ <br />36 <br />Install 12 Strand SMFO Cable <br />150 <br />LF <br />$ y <br />$ <br />37 <br />Fusion Splice 1 Strand SMFO <br />60 <br />EA <br />$C' _ <br />$ <br />38 <br />Install Fiber Optic Splice Closure <br />I <br />EA <br />$ �J r <br />$ <br />39 <br />Pothole Traffic Signal Pole Location for <br />4 <br />EA <br />$ <br />$ <br />Utility Conflicts <br />600 — <br />I L D o <br />P-2 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.