My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to i �h Street <br />Modified Initial Study Checklist <br />The following Modified Initial Study Checklist is based on the California Environmental Quality Act <br />(CEQA) Initial Study Checklist. It is modified to evaluate the proposed Project changes for which <br />environmental impact reports/statements have previously been completed to assist in the <br />determination of the need for supplemental environmental documents, in this case, a Subsequent or <br />Supplemental EIS/EIR or an Addendum under Public Resources Code 21166 and Guideline Sections <br />15162, 15163, and 15164, respectively. For purposes of this study, references to "the proposal' in the <br />left hand column questions refer to the modifications to the Project (proposed Project) as compared <br />the Project improvements evaluated in the 1990 FEIS/EIR. <br />The first four columns to the right of the modified checklist questions identify whether the proposed <br />Project changes would result in new impacts, and if so whether these impacts would be less than <br />significant, less than significant after mitigation, or significant. <br />The fifth column asks whether or not the impacts associated with Project changes, if any, were <br />sufficiently disclosed in the previous environmental documents (Not Addressed). <br />Finally, the last column indicates whether or not a Subsequent or Supplemental EIR is needed. <br />Moreover, a Subsequent or Supplemental EIR would be needed if there were new significant <br />unmitigated or substantially more severe impacts which would result from the Project changes and <br />which were not sufficiently disclosed in the previous environmental documents, <br />Discussion in support of the conclusions indicated on the checklist is provided in Chapter 3. <br />ANA 305-011 (PER 02) CITY OF SANTA ANA (0111912015) YU APPENDIX A <br />
The URL can be used to link to this page
Your browser does not support the video tag.