Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase 1118 — Washington Avenue to 17fh Street <br />MODIFIED INITIAL STUDY CHECKLIST <br />Now Impacts o. Proposed ` <br />Previous. Fe15lEIR <br />Project changes <br />No <br />Less Than <br />Less Than <br />Potentially <br />Impacts <br />Subsegs�.ent or <br />Impact <br />Signilleant <br />Significant <br />Significant <br />Disclosed? <br />Supplemental' EIR <br />Impact <br />— After <br />- Impact <br />Reyui.red? <br />Mitigation <br />X <br />YES <br />NO <br />b) Require or result in the construction of <br />new water or wastewater treatment <br />facilities or expansion of existing facilities, <br />the construction of which could cause <br />Significant environmental effects? <br />X <br />YES <br />NO <br />c) Require or result in the construction of <br />new storm water drainage facilities or <br />expansion of existing facilities, the <br />construction of which could cause <br />significant environmental effects? <br />X <br />YES <br />NO <br />d) Have sufficient water supplies available <br />to serve the project from existing <br />entitlements and resources, or are new or <br />expanded entitlements needed? <br />.......................... <br />.---............. .........-- -- - <br />........ <br />X <br />........ .............. .......... <br />....... ......_.._.._....-...._........... <br />........... ....................... <br />YES <br />NO <br />e) Result in a determination by the <br />wastewater treatment provider which <br />serves or may serve the project that it has <br />adequate capacity to serve the project's <br />projected demand in addition to the <br />provider's existing commitments? <br />- <br />...... .I ............... ...... <br />_.._.........._........ ...__... _ <br />................................................ <br />X <br />.............. <br />YES <br />NO <br />f) Be served by a landfill with sufficient <br />permitted capacity to accommodate the <br />project's solid waste disposal needs? <br />...... ...._....-................ <br />........ .... <br />._............. ... _.._._... _ <br />X <br />. ........ ....... ....... <br />....__.._...__.......--- <br />YES <br />NO <br />g) Comply with federal, state, and local <br />statutes and regulations related to solid <br />waste? <br />18. MANDATORY FINDINGS OF <br />SIGNIFICANCE. Responses to the <br />following questions are discussed in <br />Chapter 3. <br />X <br />YES <br />NO <br />a) Does the project have the potential to <br />degrade the quality of the environment, <br />substantially reduce the habitat of a fish or <br />wildlife species, cause a fish or wildlife <br />population to drop below self-sustaining <br />levels, threaten to eliminate a plant or <br />animal community, reduce the number or <br />restrict the range of a rare or endangered <br />plant or animal or eliminate important <br />examples of the major periods of California <br />history or prehistory? <br />........ <br />- --.......--• <br />b) Does the project have impacts that are <br />.............. <br />X <br />.. <br />YES <br />NO <br />individually limited, but cumulatively <br />considerable? ("Cumulatively <br />considerable" means that the incremental <br />effects of a project are considerable when <br />viewed in connection with the effects of <br />past projects, the effects of other current <br />ANA 305.011 (PER 02) CITY OF SANTA ANA (01119/2015) YU APPENDIX A <br />