My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Bristol St Improvements & Widening: <br />Phase 3A - Civic Center -Washington <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />LOCATION MAP <br />AGENCY: <br />Public Works <br />A <br />N <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned and designed to <br />incorporate complete street concepts with storm drain quality features. <br />The improvements include widening of the street from four lanes to six <br />lanes, with bus turnouts, raised median, bike lanes, and sound walls. The <br />project also brings native and organic landscaping that beautifies a fully <br />developed urban area. <br />PROJECT NEED: <br />Bristol Street from Civic Center to Washington (Phase 3A) is part of the <br />City's plan to widen Bristol Street from Warner Avenue to Memory Lane, <br />which was approved by City Council in 1990 and reevaluated in 2015. <br />Existing roadway has only 2 lanes in each direction and is operating at a <br />LOS F. This widening is needed to improve traffic flow and create complete <br />streets features. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction 5,199,933 - - - - - - <br />TOTAL 5,199,933 - - - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27128 FY 28/29 FY 29/30 FY 30/31 <br />DEMO 656,000 - - - - - - <br />OCTA BRISTOL ST CORRIDOR 3,343,933 <br />TSIA AREA F 1,200,000 <br />TOTAL 5,199,933 <br />DIVISION: <br />CIP Engineering <br />CONTACT: <br />Jason Gabriel, Principal Civil Engineer <br />DATE: <br />21-Aug-2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.