My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 13-6792; FEDERAL PROJECT NO.: DEM06L-5063(146), CML 5063(210) <br />BRISTOL STREET IMPROVEMENTS AND WIDENING FROM CIVIC CENTER DRIVE <br />TO WASHINGTON AVENUE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />80 <br />SWPPP Risk Level 2 <br />1 <br />LS <br />$ <br />$ <br />81 <br />As -Built Plans <br />I <br />LS <br />$5,000 <br />$ <br />�Ji�BC} r <br />82 <br />Construction Permit <br />I <br />LS <br />$36,300 <br />$ <br />3 3N <br />TOTAL BASE BID <br />$ <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />i This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within number (300) workin¢ days after the commencement date stated in the Notice to <br />Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $4,760 per calendar day. <br />Name of Firm Los Angeles Engineering, Inc. <br />Signature of BIDDER k) <br />Title Aaron O'Brien, Vice President I Secreta <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation., <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />Los Angeles Engineering, Inc - Corporation <br />Angus O'Brien - President <br />Aaron O'Brien - Vice President 1 Secretary <br />Melody Turner - CFO <br />P-5 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.