My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol Street Improvements and Widening from Civic Center Drive to Washington <br />Avenue Project <br />September 17, 2024 <br />Page 5 <br />The proposed contract authorizes staff a maximum of 10% in contingencies for <br />construction contract change orders. Staff will return to City Council for authorization <br />and appropriation of additional contingency if necessary. <br />With the approval of the requested appropriation adjustment, a portion of the <br />accumulated fund balance will be appropriated for spending in the Select Street <br />Construction, Improvements Other Than Building Account (No. 05917661-66220), <br />Revenue appropriated to this account is derived from the sale of land acquired from <br />right-of-way acquisitions per procedures set by OCTA Bristol Corridor Improvement. <br />The sale of land portion of the fund balance is estimated to be $6,228,834 for Fiscal <br />Year 2024-25, which is sufficient to allow for the recommended appropriation. <br />Additionally, a portion of the accumulated fund balance will be appropriated for <br />spending in the New Transportation System Improvement Area F, Improvements Other <br />Than Building Account (No. 03517660-66220). The spendable portion of the fund <br />balance is estimated to be $1,226,165 for Fiscal Year 2024-2025, which is sufficient to <br />allow for the recommended appropriation of $1,200,000. <br />With the approval of the requested appropriation adjustment, $656,000 in Federal <br />Transportation Improvement Program (FTIP) DEMO grant funds will be recognized in <br />the Select Street Construction, Federal Grant -Indirect revenue account (05917002- <br />52001) and appropriated for spending in the Select Street Construction, Improvements <br />Other Than Building Account (No. 05917660-66220). (Exhibit 7) <br />The following table summarizes the funds budgeted for expenditure to deliver the <br />construction of this project: <br />Fiscal <br />Accounting Unit <br />Fund <br />Accounting Unit, <br />Amount <br />Year <br />- Account No. <br />Description <br />Account No. <br />(Project No.) <br />Description <br />CURRENT BUDGET <br />2024-25 <br />03217663-66220 <br />CTFP Grant — <br />Measure M2 <br />$5,239,044 <br />(13-6792) <br />Measure M <br />Competitive Street, <br />Street <br />Improvements Other <br />Construction <br />Than Building <br />2024-25 <br />05917660-66220 <br />BCIP Grant — <br />Select Street <br />$793,760 <br />(13-6792) <br />Select Street <br />Construction, <br />Construction <br />Improvements Other <br />Than Building <br />2024-25 <br />03517660-66220 <br />New <br />New Transportation <br />$130,000 <br />(13-6792) <br />Transportation <br />System Improvement <br />System <br />
The URL can be used to link to this page
Your browser does not support the video tag.