Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIA — Civic Center Drive to Washington Avenue <br />Assessor Parcel Numbers (APNs) 405-262-21, -22, -23, -24, -25, -26, -27, -28, -29, -30, -31, -32, and -33; <br />and 405-274-09, -10, -11, -12, and -13) — Land use change from Park to Park with Commercial option. <br />The proposed Project lane configuration is shown on Figure 5 (Proposed Project Lane Geometries), <br />whereas the intersection lane configurations from the original approved 1990 FEIS/EIR are shown on <br />Figures 6 and 7. The proposed block wall, as described above, is also illustrated on Figure 5. <br />An assessment of construction and Project related GIIG emissions was also not addressed in the 1990 <br />FEIS/EIR, and as a result is addressed in this Addendum. <br />1.4.4 Construction Timeframe <br />Construction activities associated with the proposed Project would occur following acquisition of the <br />required parcels. Construction of the proposed Project is anticipated to begin in mid-2015 and be <br />completed within approximately one year (mid-2016). <br />1.6 Discretionary Actions <br />This Addendum must be adopted by the City of Santa Ana City Council as to its adequacy in complying <br />with the requirements of CEQA and the previously approved 1990 FEIS/EIR. The City Council will <br />consider the information contained in the Addendum and the 1990 FEIS/EIR in making a decision to <br />approve or deny the proposed Project. <br />ANA 305-011 (PLR 02) CITY OF SANTA ANA (01119t2015) YU PAGE 18 <br />