My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:11:14 AM
Creation date
9/11/2024 9:44:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 6 <br />PROJECT TITLE: <br />McFadden Avenue Rehabilitation: Fairview to <br />Raitt <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />-- <br />W 1a St <br />W 1st St <br />ytty tg yf 5j <br />j O "5M <br />Wcp--Ares u ✓ <br />i 5 G <br />�`lr <br />wr. <br />W Crnilk 5l <br />04 <br />s <br />� <br />jgr wvaons. <br />a <br />MMrkv <br />„ a <br />W MOM. Kw A.e <br />ems, <br />w boos v <br />W, <br />6 <br />aIn <br />Wl.q-i,. <br />a W Adnn Wry <br />ztz <br />- 9 <br />M <br />w " v.me AW <br />y <br />wi.v.meAre q <br />wunw., _ <br />aaa <br />W Fbn A.e <br />W Ftlw Are <br />_. •, <br />W � Ax N W Hmd An <br />W Ed„gen Ave <br />W Ede w -1;' '^ <br />- <br />CeMn�dllrpwd eM W Vmn'u s, <br />Srda An u <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program has been <br />developed to identify total deferred maintenance <br />requirements for the City's arterial network and to move <br />toward preventative maintenance. As one of the City's <br />arterial streets, McFadden Avenue pavement <br />rehabilitation is identified as a high priority in the <br />Pavement Management Program. <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Construction $1,004,536 <br />Engineering $90,325 <br />TOTAL $1,094,861 <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />M2 LOCAL $1,004,536 <br />FAIRSHARE <br />RMRA SB1 $90,325 <br />TOTAL $1,094,861 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 08-May-2018 <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.