My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSTA MESA COUNTY WATER DISTRICT (4)
Clerk
>
Contracts / Agreements
>
C
>
COSTA MESA COUNTY WATER DISTRICT (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:39:11 AM
Creation date
9/16/2024 11:06:15 AM
Metadata
Fields
Template:
Contracts
Company Name
COSTA MESA COUNTY WATER DISTRICT
Contract #
A-1976-065
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposed intertie does not conform to the general policies, <br />agreements and guidelines of this agreement, or of the require- <br />ments of law. <br />4. A. The staff officials of the parties are authorized <br />and directed by this Agreement to intertie the respective water <br />systems of the parties at whatever locations they mutually deter- <br />mine to be most appropriate to further the purposes hereof. <br />B. If any such intertie is of a permanent type designed <br />to provide an emergency water supply for all municipal purposes <br />on a mutual basis, then it is agreed that each party hereto <br />shall pay fifty percent (50%) of the capital costs of the con- <br />struction of such intertie and fifty percent (50%) thereafter <br />of the maintenance and operational costs thereof. It is con- <br />templated by the parties that such type of permanent intertie <br />will usually be manually operated and tested, and that no meter- <br />ing device will be installed in connection therewith. Accord- <br />ingly, in the absence of a meter, the amount of water delivered <br />through such an intertie from one agency to the other agency <br />shall be determined by mutually acceptable criteria, based upon <br />flow capacity, pressure, time interval of delivery, and other <br />appropriate factors. No "water main" or "footage" charges shall <br />be assessed for any such intertie by either party. Each of the <br />parties agrees that, whenever it uses or tests such a permanent <br />intertie, it shall immediately notify the owner thereof, and there- <br />after provide appropriate information concerning the amount of water <br />received through the intertie. It is further agreed that neither <br />of the parties shall receive water deliveries through such an <br />intertie for a period of time greater than five (5) consecutive <br />days unless and until the respective staff officials of the <br />parties have mutually agreed thereto. <br />C. If any such intertie is of a permanent nature and <br />is primarily for fire -flow requirements of one of the parties, <br />then in that event the party that receives the fire -flow benefits <br />therefrom agrees to pay one hundred percent (1000) of the capital <br />3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.