Laserfiche WebLink
1i <br />2� <br />31 <br />4 <br />5� <br />6' <br />8� <br />9 <br />10 <br />11 <br />12 <br />131 <br />1.4' <br />15 <br />i <br />171 <br />is <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26� <br />2'7 <br />28 <br />29 <br />30 <br />31 <br />32 <br />Section 6500 et seq, wish jointly to exercise their individual <br />powers to construct and equip buildings for museum, art <br />gallery and art institute purposes, and to share in.the fund- <br />ing responsibility, in order to construct and equip an Educa- <br />tion Center building as part of the Bowers Museum with the <br />provision that said Education Center as well as the other faci- <br />lities of the Bowers Museum be operated by CITY in a manner <br />that insures their availability to all of the citizens of the <br />county. <br />Now, therefore, in consideration of the benefits to be <br />received by each party as a result of their joint action, the <br />parties hereto agree as follows: <br />.1. An Education Center shall be constructed adjacent to <br />-the 'exi-sg Bowers 'Museum located at -2002 'North Main 'Street, <br />Santa Ana, California. The Education Center shall consist of <br />two (2) parcels of land with a total of 39,262 square feet and <br />i a building of approximately 5,000 square feet. <br />2. The Project to be jointly funded shall include the pur- <br />chase of two parcels of land, the demolition of all buildings <br />thereon, conversions of properties for Education Center and park- <br />ing :dot use, construction of one building for use as an Educa- <br />tion Center and purchase of the capital equipment which is des- <br />cribed in that certain four page list entitled "Education Center <br />Capital Equipment" designated "Exhibit A" attached hereto and by <br />this reference incorporated herein. The Project does not include <br />appraisal cost, design overhead or operation and maintenance of <br />the Education Center, for which CITY agrees to be responsible <br />entirely. However, CITY agrees that appraisals and preliminary <br />title documents shall be approved by COUNTY before lands are <br />-2- <br />