My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (47)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF (47)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 8:34:04 AM
Creation date
9/16/2024 4:58:52 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-1975-035
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S y S <br />DEPAfR tjlENT OFPLIBLICWORKS (714) 834-4142 <br />` 20 CIVIC CENTER PLAZA SANTA ANA "� CALIFORNIA 92701 <br />f <br />July 2, 1975— <br />Mr. Clifford W. Ensley, Project Engineer <br />County of Orange <br />Building Services Department <br />628 Borth Sycamore Street <br />Santa Ana, CA 92701 <br />SUBJECT: ORANGE COUNTY YOUTH GUIDAINCE CENTER WATER MAIN FOR FIRE PROTECTION <br />The proposed expansion of the Orange County Youth Guidance Center on E:esperian <br />Street will require a fire flow of 3500 gpm. Fire.flow tests by the Santa Ana . <br />Eire Department indicate a present capacity of 1500 gpm from the eight --inch <br />water main in Bristol and Hesperian Streets. The additional capacity required <br />can be provided by installing a 12-inch water main in Bristol Street from . . <br />Memory Lane to Hesperian Street via the La Ueta offramp. The additional water <br />main will provide a looped system adequate to supply 3500 gpm for fire flow <br />add i t ion to the domresti c water demands. <br />The estimated cost for the water main and required additional services is: <br />12" A.C. water main 2800' @ $13/ft $36,400 <br />Cut and replace pavement 2800' @ $6/ft 16,800 <br />53,200 <br />Contingencies 10% and Engineering 10%. _�_�_0,640 <br />63,840.. <br />4" water service 2,100 <br />10" x 12" fir service 3,600 <br />69,540 <br />Rounded $70,009 <br />The installation will be made at cost. The City of Santa Ana can do the <br />work against a County of Orange purchase order. Progress statements will be <br />required because of the large amount. <br />A reimbursement 1greement will be provided for the possibility of other <br />connections to this water main. Proposed developments within the freeway \\ E <br />complex could take advantage of the availability of this water main; so \ f <br />they should share in the cost of installation. The proportionate share. \ <br />would be in proportion to the benefits received. <br />Sincerely, _ \ <br />Walter D. Schraufi <br />Senior Civil Engineer <br />Water Engineering Section <br />EXHIBIT AI <br />
The URL can be used to link to this page
Your browser does not support the video tag.