My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (55)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF (55)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 8:35:28 AM
Creation date
9/17/2024 11:25:49 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-1976-088
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R676 -510 <br />said Project, including Certificate of Cost and <br />2 <br />Certificate of Completion of Project. <br />3 <br />B. Maintain and operate said traffic signal and highway <br />4 <br />lighting system as defined by paragraph VI hereof. <br />II. <br />COUNTY shall: <br />6 <br />Reimburse the CITY for its actual share of the Project <br />7 <br />cost as defined by Section III with payment being made <br />1 <br />81 <br />in the manner described in paragraph V. Said actual <br />() <br />share is ��98.L)3, including engineering and <br />10 <br />inspection costs. <br />III. <br />COUNTY'S actual share of the cost for modification and <br />121 <br />upgrading of the existing traffic signal and intersection <br />1 <br />131 <br />lighting is based on the contract lump sum bid price <br />14 <br />for said portion of the contract, and be in the ratio <br />15 <br />of the number of traffic legs of the intersection lying <br />16 <br />within the COUNTY to the total number of legs entering <br />17 <br />the intersection, as the COUNTY -CITY limits exist at <br />18 <br />the time the CITY advertises the contract for the <br />19 <br />Project. As of the date of this agreement, said COUNTY'S' <br />20 <br />actual share is one-fourth (1/4) of the lump sum bid <br />21 <br />price for the traffic signal and intersection lighting, <br />22 <br />based on the fact that one leg of the intersection <br />23 <br />presently lies within the COUNTY and three legs of the <br />24 <br />intersection lie within CITY area. <br />25 <br />IV. <br />COUNTY'S share of design, survey and construction <br />26 <br />engineering costs shall be the actual costs accrued <br />27 <br />to the COUNTY portion based on the percentage of the <br />28 <br />total contract unit costs billed to COUNTY. <br />29 <br />V. <br />CITY agrees to submit full, true and correct copies of <br />30 <br />documents, certificates and itemized bills to COUNTY, <br />31 <br />and COUNTY shall reimburse CITY within thirty (30) days <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.