My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (66)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF (66)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 8:36:38 AM
Creation date
9/17/2024 11:48:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-1978-063
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and completion of said PROJECT, including Certificate of Cost and Certificate <br />2 of Completion of Project. <br />3 B. During the period of construction, have Jurisdiction over the <br />4 .construction area including that portion within COTJNTY territory. <br />5 C. Maintain and operate said traffic signal and highway lighting <br />$ system as defined by paragraph IV hereof. <br />7 Ii. COUNTY shall: <br />8 A. Be responsible for the cost of COUN`1'Y's portion of PROJECT <br />9 including design, construction and construction inspection. Said cost shall be <br />10 limited to twenty-five percent (25%) of the cost of PROJECT based on the fact that <br />11 ,one of the four traffic legs of the intersection lies within COUNTY territory. <br />12 For the purpose of this agreement, the 'total cost of design and construction <br />13` engineering shall be limited to ten percent (10%) of PROJECT construction costs. <br />14 B. At all tines during the progress of construction of COU11TY <br />15 portion of PROJECT,, have access to the work thereon for the purpose of inspection <br />36 thereof and. should COUNTY deers any remedial measures to be necessary, WDIM, <br />17 shall notify CITY thereof. <br />1$ C. Reimburse CITY for COMTT'Y's share of PROJECT cast. Said share <br />is defined in Section II.A. and is -determined to be Six thousand sixty -sight and <br />20 50/100 dollars ($6,068.50) based upon a twenty-five percent (25%)-share of <br />'21 the following items: <br />1. lump sun bid price for traffic signal <br />modification $18,395 <br />23 <br />. 2. cost of signal standards 3,I,72 <br />24 <br />- - - 3. design and construction inspection <br />25 t10% of (1) and (2)3 h 2,207 <br />.26 'TOTAL $24 , 274 <br />.7 In no event shall C©UN7Y's share of PROJECT cost exceed Six <br />28 thousand Sixty --eight and 50/100 dollars ($6,068.50). <br />.-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.