Laserfiche WebLink
Slide 65 Related Bristol Specific Plan <br />Item No. 22 <br />Planning and Building Agency <br />September 17, 2024 <br />Overview of Mitigation Measures (Part 1) <br />GPU FEIR Mitigation Measures <br />•MM AQ-1 and MM AQ-2 (Project-specific studies) <br />•MM CUL-4 (Project-specific study) <br />•MM CUL-6 (Archaeological and Tribal Monitoring <br />•MM GEO-2 (Project-specific study and <br />Paleontological Monitoring) <br />•MM GEO-3 (Incidental Discoveries) <br />•MM N-1 (Construction Noise Reduction) <br />Project-Specific Mitigation Measures <br />•MM AQ-1: Construction Exhaust & Dust Control <br />•MM AQ-2: Low VOC Paints (Construction) <br />•MM AQ-3: Vehicle Trip Reduction <br />•MM AQ-4: Prohibition of Fireplaces <br />•MM AQ-5: Electric Landscape Equipment <br />•MM AQ-6: Low VOC Paint (Operations) <br />•MM CR-1: Procedures for Archaeological <br />Discoveries <br />•MM CR-2: Cultural Monitoring Report