Laserfiche WebLink
IMPLEMENTATION TIMELINE <br />VIL COST EFFECTIVENESS ANALYSIS <br />PROGRAM STATISTICS: <br />Number of Sites Retrofitted <br />Calculated Water Savings: <br />Annually <br />29 AF <br />Life of Project <br />COST: <br />10 years <br />Contractual <br />$ 69,587,55 <br />In-house <br />Total <br />$ 5,907.20 <br />BENEFITS: <br />$ 75,494.75 <br />Annual Water Savings <br />Lifetime Water Savings <br />$ 12,932.00 <br />BENEFIT/COST ANALYSIS: <br />$141,592,00 <br />BC = Benefits 141592 — <br />Analysis —�`s� <br />1.9 <br />7 <br />