Laserfiche WebLink
344 <br /> <br />In Re <br />Bids <br />Fire Alarm System <br /> <br />In Re <br />Vacate portion <br />of Orange Ave. <br /> <br />'Bid o2 Pacific States Cast Iron Pipe Co.: Bond in the <br />amount of 10% accompanied bid. <br />5000 feet 8"x18~ Class 150 Bell & Spigot Thin Cement <br />lined, Cast Iron Pipe, with Seal Coat, Federal Spew- <br />lfications WW-P-421, Type I $2.23 ft. Prices are f.o.b. <br />foundry at Ironton, Utah with full carload freight and <br />trucking allowed to City yard or to Job-cite in Santa Ana. <br />Terms are 30 days net. Prices quoted are exclusive of any <br />State or City use tax which might apply. Shipment can be <br />made within tha'ee to four weeks after receipt of order. <br /> <br />Bid of James B. Clow & Sons: Bond in the amount of $2000.00 <br />accompanied bid. <br />5000 feet 8"xl8' B&S, Class 150 $ $2.$1 per foot. Net Price <br />is f.o.b.~ at Tarrant, Alabama with rail and water freight <br />and trucking prepaid to Santa Aha, based on present tariff <br />rates. Price is firm price, (no escalator clause) and is <br />subject to neither increase nor decrease except for change <br />in freight rates. California Sales or Use Tax is not <br />included in quotation and would be added to invoice as <br />applicable. Terms 30 days net. Estimate of delivery date <br />is 45 to 60 days, subject to terms and conditions. <br /> <br />Bid of American Cast Iron Pipe: Bond in the amount of $1250.00 <br />accompanied bid. <br />5000 ft. 8" Bell and Spigot Mono-Cast "Enamelined" Centrifugal <br />Pipe, Class 150, in 16' lengths, for 150 pounds working pressure, <br />per foot $2.293. Price f.o.b, t~ucks Santa Ana for shipment <br />from foundries in Birmingham, Alabama, based on current rail, <br />steamer and truck rate, minimum shipment $0,000 pounds, any <br />changes in which are to be reflected in price quoted, and for <br />truck delivery to Jobsite, or City storeyard, where available <br />to large truck and trailer. Unloading to be done by City <br />forceS. Price does no~ include California State Use Tax of <br />3% and terms are net thirty days. Delivery within seventy-five days. <br /> <br />On motion of Trustee McBride, seconded by Hunter and carried, the bids <br /> <br />were referred to the <br />,, <br />On motion of, Trustee <br /> <br />Administrator and City Engineer for report. <br /> <br />Jerome, ~seconded by Dahl and carried, the Clerk <br /> <br />was authorized to open the bids for the furnishing, overhauling, <br /> <br />mo~ing and extending of Fire Alarm System, as follows: <br /> <br />Bid of Grimes Electric: Bond in the amount of 10% accompanied <br />bid. <br />Furnishing all equipment, material and labor in accordance <br />with plans and s~ecifications for a fire alarm system for <br />the lump sum of $32,900.00. Addenda numbers l, 2, 3 and 4 <br />are included. Price includes the replacement of 28,000 ft. <br />of #10 overhead circuit wires,~which represents 50% of the <br />estimated total of existing overhead, circuit wires to be used <br />in the system. If a larger percentage of these existing over- <br />head circuits require replacement such material and labor would <br />be furnished at the rate of $92.00 per'l,000 feet. As an <br />alternate we offer a system of flashing lights to indicate at <br />new alarm boxes, which would operate over the regular alarm <br />circuit wires and could be extended to provide lights at boxes <br />where overhead circuits are involved, for the sum of $2,243.00 <br />added to our base bid. As a further alternate, we cffer~complete, <br />modern new main panels in the new Fire Alarm Headquarters, in <br />place of moving the existing old main panel and repeater, for the <br />additional sum of $5,936.00 added to our base bid. <br /> <br />Bid of The Gamewell Company: Certified check in the sum of <br />$3,400.00 accompanied bid. <br />Furnishing equipment, installation and overhaul of Fire Alarm <br />System, all in full compliance with "General Specifications for <br />Fire Alarm System" and Addenda, for the total sum of $33,173.25. <br />Included in the figure is an amount of $151.25 which covers <br />engineering services rendered by the field engineers, which is <br />relevant to the equipment and other work included in this proposal. <br />Entire work could be completed within approximately 90-120 days <br />from receipt of order with full information. <br /> <br />On motion of Trustee Hunter, seconded by Jerome and carried, the bids <br /> <br />were referred to the Administrator, Fire Chief and Purchasing Agent <br /> <br /> Tot report on March 30, 1953. <br /> # <br />· This is the date set for the hearing as advertised in Resolution 53-15 <br /> <br />for the vacating of a portion of Orange Avenue in the vicinity of <br /> <br />Adams Street. The City Attorney reported that the Southern Counties <br /> <br />Gas Company has a line on Adams Street which would be involved in the <br /> <br />vacation. It was moved by Trustee Dahl, seconded by Jerome <br /> <br /> <br />