My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LAN LAB COMMUNICATIONS
Clerk
>
Contracts / Agreements
>
L
>
LAN LAB COMMUNICATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:13:56 PM
Creation date
9/18/2024 2:17:04 PM
Metadata
Fields
Template:
Contracts
Company Name
LAN LAB COMMUNICATIONS
Contract #
A-2000-113D
Agency
Finance & Management Services
Destruction Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18, r, order to obtain a general guideline of pricing for products and services <br />rendered, below are two sample fobs that need to be quoted. Any detail riot <br />provided shalt be clarified using the standards and practices outlined in the RF P <br />document above, or by contacting David LaBossiere, SCS Project Manager, at the <br />number listed in the RFP. Please provide a quote for the following sample jobs: <br />{SAMPLE #1: Provide and install (-4) Category 5 cables, at 200 feet each, <br />to the same location in an air return ceiling area. € wo cables will. be <br />terminated into a contractor -provided 24 port patch panel on one side <br />and 8PSC-type Category 5 modules on the station side; the other two <br />cable) will be terminated into a Contractor -provided 300FTI 1100ock <br />assembly and again 8P8C-type Category 5 modules on the station side. <br />Assume a clear path in the ceiling to the patch panel and the station <br />side. utilizing Erico J-hooks in the ceiling for cable pathway support. On <br />the station side, assume there is flea; conduit running from a single gang <br />outlet box to the top of the wall, in a stub -out fashion. V <br />Provide a breakdown of hours bW e y,.,�=- <br />, , � � <br />µ <br />2) <br />Provide a breakdown of cast of Werials.NT <br />ff <br />�'• i"�d'?t"..< <br />� <br />i <br />G:j f <br />details and amounts of any other <br />charges that would be billed to <br />7'M•SFL <br />3 j <br />i �t�ide <br />the City. <br />4) Provide approximation of elapsed time to complete work, beginning <br />from authorization to final acceptance. <br />SAkADI C' #2: Contractor shall provide and install one (12/6)-multi-mode <br />single mode, fiber optic- cable running from the basernent Equipment <br />Room ER6.2 to the 8tn floor Telecommunications Closet TC8.11. Fiber <br />optic cable wiU terminate in ERB.2 onto an appropriately configured <br />Lucent l_GX Fiber Optic Distribution System, using an LST'{ U-D72/ 7 shelf <br />with 5T-type connectors. In TC8.1, fiber optic cable should terminate <br />onto an Appropriately configured Lucent Sliding Combination Shelf, using <br />a 60OB2 One -Unit High type shelf with 5T-type connectors. Rack space <br />required exists at both termination points. One, empty -inch conduit <br />exists between ER12 and TCB.1 (the Basement Tetecommunications <br />Closet that is vertically stacked with the rest of the floors including our <br />destination closet, TC8. i ). Contractor shalt provide and install (4) one <br />
The URL can be used to link to this page
Your browser does not support the video tag.