My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Clerk
>
Contracts / Agreements
>
M
>
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 4:49:21 PM
Creation date
9/18/2024 2:19:59 PM
Metadata
Fields
Template:
Contracts
Company Name
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Contract #
A-1999-091
Agency
Public Works
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In order to deliver Recycled Water from IRWD to OCSD during the winter via the intertie, a <br />portion of the Project's distribution system is used. Hence, in this Agreement, the cost of <br />facilities to make deliveries to Project End Users and OCSD via the OCWD/IRWD intertie are <br />prorated as outlined in Exhibit B, Section 5. <br />Groundwater <br />OCWD currently blends groundwater with Recycled Water produced by the tertiary plant to <br />control total dissolved solids (TDS) Ievels. Groundwater is ineligible for payment under this <br />Agreement. In addition, IRWD's groundwater may be pumped from satellite wells located in <br />Santa Ana into the Project's Recycled Water distribution system and conveyed to IRWD via the <br />intertie. IRWD may compensate OCWD for use of Project facilities to wheel groundwater <br />through the system. OCWD will receive water quality benefits in the form of reduced'total <br />dissolved solids levels in Recycled Water delivered to their Newport Beach customers. <br />Payments by IRWD for use of Project facilities to convey groundwater shall be treated as <br />negative capital and operation and maintenance cost values in Exhibits B and C. <br />Distribution System <br />The Project also includes varying diameter Recycled Water pipelines in Fountain Valley, Santa <br />Ana, Huntington Beach, Costa Mesa, Newport Beach, and Huntington Beach. Other facilities <br />include a treated water clearwell and pump station at GARP, storage facilities and booster pump <br />stations in the distribution system to maintain system operation and pressure. <br />End Users <br />Recycled Water from the Project will be used for non -potable landscape, agricultural, <br />commercial and industrial purposes. This amount excludes Recycled Water deliveries (about <br />5,000 AFY) to OCSD, which is not part of this Agreement. <br />Points of Connection <br />Project facilities shall terminate at the points of connection to the potable distribution systems, <br />sewer systems, storm drains, groundwater extraction systems, OCSD Plant Nos. 1 and 2, <br />connection to the OCWD/IRWD Intertie, secondary effluent connection to GARP, and meter <br />connections to the End Users. <br />Agreement 22156 -13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.