My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Clerk
>
Contracts / Agreements
>
M
>
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 4:49:21 PM
Creation date
9/18/2024 2:19:59 PM
Metadata
Fields
Template:
Contracts
Company Name
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Contract #
A-1999-091
Agency
Public Works
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT F <br />PERFORMANCE PROVISIONS <br />Until a project reaches its Ultimate Yield in any one Fiscal Year, the following <br />performance provisions apply: <br />It. Metropolitan will terminate this Agreement if construction has not commenced by <br />June 30, 2001. As opposed to Provision lb below, there is no established appeal <br />process for this outcome. <br />b. Metropolitan will terminate this Agreement if Allowable Yield is npt.delivered by <br />June 30, 2005. The Project sponsor(s) may, appeal this decision to MetropolitWs <br />Boaird' of Directors. <br />C. If the Allowable Yield during the 2003-04 through 2006-07 Fiscal Years after <br />agreement execution does not reach the target yield of 37% of the Ultimate Yield, <br />then Metropolitan will reduce the Ultimate Yield by one-half the 37% target <br />shortfall using the highest Allowable Yield produced in that period. For example, <br />the Ultimate Yield of a project with the following performance will be revised <br />from 2,000 to 1,950 AFY for Scenario 1 while there would be no adjustment <br />under Scenario 2: <br />Project Ultimate Yield = 2,000 AFY <br />Scenario I <br />Scenario 2 <br />Fiscal Year after <br />agreement execution <br />Allowable <br />Yield (AFY) <br />Allowable <br />Yield (AFY) <br />2003-04 <br />400 <br />400 <br />2004-05 <br />640 <br />650 <br />2005-06 <br />450 <br />750 <br />2006-07 <br />500 <br />500 <br />37% of the Ultimate Yield = 0.37 x 2,000 = 740AFY <br />Scenario 1: Shortfall = 740 - 640 = 100 AFY <br />Revised Ultimate Yield = 2,000 - (0.5 x 100) = 1,950 AFY <br />Scenario 2: Since, the Allowable Yield in the 2006-07 is greater than 740, no <br />adjustment is required. <br />d. If the Allowable Yield during Fiscal Years 2007-08 through 2010-11 does not <br />reach the target yield of 63% of the Ultimate Yield, then Metropolitan will reduce <br />the Ultimate Yield (or the Revised Ultimate Yield) by one-half the target shortfall <br />using the highest Allowable Yield produced in that period. For Example, the <br />Ultimate Yield of the project in above example with the following performance <br />Agreement 22156 -23- <br />
The URL can be used to link to this page
Your browser does not support the video tag.