My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Clerk
>
Contracts / Agreements
>
M
>
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 4:49:21 PM
Creation date
9/18/2024 2:19:59 PM
Metadata
Fields
Template:
Contracts
Company Name
METROPOLITAN WATER DISTRICT OF SO. CALIF ET AL
Contract #
A-1999-091
Agency
Public Works
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3: Ownership and Responsibilities <br />3.1 OCWD shall be the sole owner of the Project facilities. Metropolitan, MWDOC, <br />CMWD, and SA have no ownership right, title, security interest or other interest in the <br />Project facilities. <br />3.2 OCWD shall be solely responsible for all design, environmental compliance, right-of- <br />way acquisitions, permits, construction, and cost of the Project and all modifications <br />thereof. <br />3.3 OCWD shall be solely responsible for operating and maintaining the Project in <br />accordance with all applicable local, state, and federal laws. Metropolitan, MWDOC, <br />CMWD, and SA shall have no rights, duties or responsibilities for operation and <br />maintenance of the Project. <br />3.4 OCWD shall install, operate and maintain metering devices for the purpose of measuring <br />the quantity of Recovered Water, Deliveries to OCSD and Allowable Yield delivered to <br />each End User. OCWD shall also provide electrical metering devices to accurately <br />measure the energy used for the Project to determine incurred operation and maintenance <br />costs. Metropolitan shall not pay for electrical energy cost if OCWD fails to install <br />electrical metering devices. <br />3.5 OCWD shall, at all times during the term of this Agreement, use its best efforts to <br />operate the Project facilities to maximize Allowable Yield on a sustained basis. <br />3.6 OCWD shall assist Metropolitan in its effort to forecast future Project production and cost. <br />3.7 OCWD shall notify and provide Metropolitan with copies of relevant agreements if <br />OCWD decides to convey water using Project facilities to any party that is not an End <br />User. <br />Section 4: Billing Process <br />4.1 Metropolitan shall pay OCWD, through MWDOC, CMWD, and SA, the Final LRP <br />Contribution for the Allowable Yield. <br />4.2 Metropolitan shall consult with OCWD to determine the Estimated LRP Contribution <br />based on historic cost data and expected Project activities. Reconciliation of the <br />Estimated LRP Contribution and Final LRP Contribution shall be performed by <br />Metropolitan pursuant to Section 5. <br />4.3 OCWD shall invoice Metropolitan monthly for the Estimated LRP Contribution based <br />upon the Allowable Yield billed to the End Users during the previous month. <br />Metropolitan shall pay OCWD for invoiced Estimated LRP Contribution pursuant to <br />Sections 4.1 and 4,2 by means of a credit included on the next water service invoice <br />issued to MWDOC, CMWD, and SA. <br />Agreement 22156 -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.