Laserfiche WebLink
Task 2 - Base Information Analysis (4 weeks - no meetings): <br />Consultant duties under this task are as follows: <br />1) Master Plan: <br />Review all proposed exhibit and interpretive plans and master plan <br />documents. l e_ <br />2) Complementary and Competing Cultural Facilities: <br />Assess and analyze the contextual relationships of the Santa Ana Zoo to <br />other potentially complementary or competing cultural. facilities. <br />3) Existing Site Conditions and Context: <br />Evaluate and analyze the land use and circulation patterns of the Santa <br />Ana Zoo and adjacent neighborhoods. Evaluate the potential constraints <br />of other limiting factor: soil conditions, utility infrastructure, <br />noise, etc. <br />4) Review Existing Exhibits and Facilities: <br />Evaluate existing exhibits and zoo support facilities. <br />5) Workshop Preparation: <br />Prepare data collection tools for the workshop, specified in Task 3. <br />Task 3 - Conceptual Planning Workshop (3 days - 3 meetings): <br />This phase of the work will consist of three, half -day sessions with the <br />entire Project Team extending over a period of three days. The intent of these <br />sessions will be to achieve consensus in the following areas: <br />1) Zoo Goals and mission Statement: <br />Develop and/or confirm the present Santa Ana Zoo Goals and mission <br />Statement with the Project Team. <br />2) Review Existing Site Opportunities and Constraints: <br />Present initial site analysis of the major opportunities and constraints <br />offered by the Santa Ana Zoo and the adjacent neighborhoods. <br />3) Review Existing Exhibits and Facilities: <br />Present the evaluations of existing exhibits and facilities for <br />consensus. <br />4) Statement of Purpose: <br />Develop a preliminary Statement of Purpose for this Master Planning <br />effort. What directions should this Master Plan establish? What <br />implementation strategies and tools should it provide? <br />3 <br />