My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-09-23
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/23/2024 Adjourned Regular and Special SA
>
Agenda Packet_2024-09-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 8:41:21 AM
Creation date
9/23/2024 8:23:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT 6 <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />The City's Pavement Management Program has been <br />developed to identify total deferred maintenance <br />requirements for the City's arterial network and to move <br />toward preventative maintenance. As one of the City's <br />arterial streets, McFadden Avenue pavement <br />rehabilitation is identified as a high priority in the <br />Pavement Management Program. <br />McFadden Avenue Rehabilitation: Fairview to <br />Raitt <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Construction <br />Engineering <br />$1,004,536 <br />$90,325 <br />TOTAL $1,094,861 <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />M2 LOCAL $1,004,536 <br />FAIRSHARE <br />RMRA SB1 $90,325 <br />TOTAL $1,094,861 <br />AGENCY: <br />Public Works Agency <br />DIVISION: <br />Design Engineering <br />CONTACT: <br />Jason Gabriel, Principal Civil Engineer <br />DATE: <br />08-May-2018 <br />- 8 - <br /> <br /> <br />City Council 13 – 76 9/23/2024
The URL can be used to link to this page
Your browser does not support the video tag.