My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/23/2024 Adjourned Regular and Special SA
>
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:54:41 PM
Creation date
9/23/2024 9:11:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.20.6965. ATP 5063(196) • STANDARD AVE BIKEWAY FROM WARNER AVE TO 2Nn ST <br />PROJECT NO.20-6962. ATP 5063(198) MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRANT) AVE <br />PROJECT NO.23-6707 - STANDARD AVE PAVEMENT REHADTUTATION FROM WARNIA AVE TO 2NI) ST <br />PROJECT NO.23-6�705 - MCFADDEN AVE PAVEMEN l' REHABILITATION FROM HARBOR DI' D TO FAIRVIEW ST <br />PROJECT NO. 19-6923 - MCFADDEN AV]-, PAVEMENT REHA$ILIrATION FROM FAIRVIEW ST TO RAITT ST <br />PROTECT NO. 23-6706 - MCFADDEN AVE PAVEMENT REIIABII.ITATION FROM RAFf'T ST TO GRAND AVE' <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Vid❑ Samarzich, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have careffrlly examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sutn(s) set forth in the following <br />schedule: <br />BASE BID: <br />20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />20-6962, ATP 5063(198) - MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />19-6923 - MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />23-6707 - STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2ND ST <br />I tern Description Qty Unit Unit Price Amount <br />1 STORM WATER POLLUTION 1 LS S w <br />PREVENTION PLAN (SWPPP) - 256,000.00 258,000,00 <br />RISK LEVEL 2 <br />2 UNCLASSIFIED EXCAVATION* 6,173 CY S 5 <br />176.00 1,080,275.00 <br />3 REMOVE EXISTING TREE 2 EA S <br />3,000.00 6,000.0o <br />4 COLD PLANE EXISTING 706.910 SF S 5 <br />ASPHALT CONCRETE 0 65 459,426,50 <br />PAVEMENT LTI MAX <br />5 CONSTRUCT ASPHALT 9,822 TON S _ <br />RUBBER HOT MIX (THICKNESS 195.00 <br />PER PLAN)* 1,915,290.00 <br />6 CONSTRUCT ASPHALT 3,100 TON S S, <br />CONCRETE PAVEMENT* 175-00 542,500.00 <br />7 CONSTRUCT AGGREGATE 370 TON S S, <br />BASE* 90.00 33, 300.00 <br />8 CONSTRUCT MODIFIED 8,570 LF ti S <br />CONCRETE CURB AND <br />GUTTER TYPE A-2-8 PER C.S.A. 76.00 642,750,00 <br />STD PLAN NO. 1101 WITH 1' <br />GUTTER PLATE PAN <br />P- I of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.